ECC POLICY
N.E.S.C. BEST PRACTICES
ECC FACTS
SAFETY FIRST
IS FIBER FASTER? OR ARE YOU JUST GETTING OLD? (Changes in Telecom Standards Over the Last 10 Years)
100

This document outlines the expectations, rules, and responsibilities for all ECC employees.

What is the Employee Handbook?

100

Guy wires must be marked with these if placed across pedestrian walkways or areas with foot or vehicular traffic

What are high-visibility guy markers? (Guy Guards)

100

In March of 1999, this bench mark in ECC history took place. 

What is the Dycom acquisition? 

100

Before climbing a ladder, workers should inspect for instability, missing feet or rungs and this

What is damage?

100

This legacy telecom platform is being phased out in favor of FTTH.

What is DSL?

200

This ECC platform allows anonymous reporting of misconduct or ethical concerns.

What is EthicsPoint?

200

Communication cables on joint-use poles must maintain this minimum vertical separation from secondary power lines.

What is 40 inches?

200
In 2024, this type of customer was ECC's largest

What is Rural Co-Op's?

200

Hard hats must be replaced this often, even if no visible damage is present. Sooner if damage is identified

What is every 5 years?

200

In the past 10 years, this type of splitter has become the standard for GPON & XGS PON networks. 

What are 1:32 splitters?

300

Employees are required to complete this daily before beginning any task.  

What is a JTSA?

300

Communication lines crossing roadways accessible to large trucks must maintain this minimum vertical clearance.

What is 18 feet? (Note: NESC 2023 update increased from 15.5–16 ft depending on conditions)

300

As of May 2025, ECC has this many offices

What is 65?

300

The most common soft tissue injury in construction is due to this.

What is improper lifting?

300

Though not the most common, this industry change has made aerial fiber builds more cost-effective and faster to deploy.

What is ADSS? (all-dielectric self-supporting)

400

All employees are required to notify these two groups, in order, when an injury occurs on a jobsite if it is not life threatening.

1: Safety (Colby Davis)

2: Direct Supervisor/Manager

400

To meet NESC grounding requirements, communication strand must be bonded to this at each pole.

What is the vertical ground?

400
ECC currently has this many active sub-contractors working on projects across the country (round to the nearest hundred)

What is 400?

400

These specific signs can only be used when this activity is taking place on a job site. They are required to be taken down as soon as this activity is completed. 

What are flagger signs?
400

This piece of equipment distributes signal to multiple customers over a passive fiber network, used daily on Frontier FTTH deployments.

What is an OLT (Optical Line Terminal)

500

Per ECC policy, employees operating equipment must complete this document before use each day.

What is a "Pre-Use" or "Pre-Flight" inspection?

500

According to the NESC, communication cables installed in a span with limited clearance can be placed above power when this condition exists.

What is NEVER. Communication cables can not be placed above power at the pole or midspan. 

500

Gary Ervin completed his goal to climb all 7 Major summits in 2022. This mountain was the final mountain to complete that challenge.

What is Mt. Denali?

500

When working in elevated areas, this is the maximum allowable free-fall distance for a properly used personal fall arrest system under OSHA regulations.

What is 6 feet?

500

Fiber networks send data using this, making it faster than traditional network architectures  

What is light?

M
e
n
u