Context
Timeline
Impacts
Methods
Quantification
100

In what city is the Eglinton LRT located?

Toronto, ON

100

What event in 2020 prompted the 2nd lawsuit?

COVID-19 Pandemic
100

An economic impact is usually ____.

Quantifiable

100

Identify a stakeholder that is affected by proposed plans, and undergoes community consultation to receive their feedback

General Public, Local Business Owners, & Indigenous Communities

100

What is compared in a benefits case analysis?

Costs and Benefits

200

What construction contract model was selected for the Eglinton LRT project?

P3 (Public-Private-Partnership)

200

How many times did Crosslinx sue Metrolinx?

3 times

200

What is the name of the community that was eroded as a result of the construction of the Eglinton LRT?

Little Jamaica

200

What sort of community consultation event is hosted to gain feedback with affected stakeholders?

Open House

200

What mode of transportation did Option 4 analyze, despite having been noted as highly expensive in the EA?

Subway

300

What company is the owner of the Eglinton LRT?

Metrolinx

300

Which mayor of Toronto cancelled the Transit City plan in 2010?

Rob Ford

300

List 3 (out of 4) of the social impacts of the Eglinton LRT.

  • Noise and vibration
  • Displacement of existing features
  • Loss of sense of community in Little Jamaica
  • Improved public health
300

Identify one of the factors that the TTC used to justify Laird Station's location

Equal Travel Distance (between stations), Balanced community accessibility (between houses, malls, and school), increased eastwards space for special trackwork

300

True or False: the Benefits Case Analysis was longer in page length than the Environmental Impact Assessment

False (BCA was 49 pages while EIA was 366 pages)

400

How many stations make up the Eglinton LRT? 

25 stations

400

What date did the Eglinton LRT first open?

February 8th, 2026

400

Name the 3 Wider-Economic-Benefits (WEBs) that the Eglinton LRT brought.

1) Agglomeration (increased density)

2) Increased competition

3) Increased labour supply

400

Following the identification of an impact, name one of the subsequent steps in dealing with the impact as outlined by an EA

Mitigation, Monitoring & Contingency

400

Identify one of the quantified benefits noted in the benefits case analysis.

Forecasted Ridership, Transit/Auto User Time Saving, VKT Removal/Safety Savings, or Transit System Revenue

500

Name at least 3 companies that are part of the Crosslinx consortium.

ACS-Dragados, Aecon, EllisDon, AtkinsRealis

500

What was the value of the third lawsuit/settlement between Crosslinx and Metrolinx?

Unknown/Not publicly released

500

Name the station that is a Provincially designated Urban Growth Center and high-density Mobility Hub.

Yonge Station

500

How did the Eglinton LRT EA categorize different types of impacts?

1) Displaced Features (Pre-Construction Impacts)

2) Construction Impacts

3) O&M Impacts

500

How much later was the benefits case analysis finished after the environmental assessment?

2 years