This is the minimum number of people needed to operate a mobile elevated work platform.

2 Employees
100

Electrical Panels have to be accessible with no storage within _____ feet of them. 

3 feet. 
100

Every year in the first quarter we must complete our mandatory GWP's. There are ___ topics we cover. 

14 Topics


100

A clean linen room should have what kind of pressure.  

Positive

200

A door in a two-hour fire rated wall assembly must have a label indicating that the door is rated to minimum of what rating. 

1 1/2 Hours Fire Rating

200

This is the maximum clearance permitted between the bottom edge of a fire door and the finished floor material.

3/4 of an inch.

200

Regardless of the tool or equipment always _________  __________ anything you use on the job before commencing work. 

Visually inspect. 

200

You receive a work order to hang some PPE holders in OR's. In order to proceed you will need to submit these two items in Maximo.

PCRA and ICRA

300

The NFPA 704 Diamond depicts these 4 Hazardous Materials Classifications.

Fire Hazard

Reactivity

Specific Hazard

Health Hazard


300

The minimum required clearance for a corridor in a business occupancy is _____ inches. 

44 inches. 
300

At this height OSHA requires fall protection for general industry. 

4 Feet.

300

While completing an inspection the ATS at one of the ambulatory clinics you notice that the critical branch is compromised. You notify your supervisor of the condition. These measures must now be put in place.

ILSM - Interim Life Safety Measures

400
OSHA & ANSI have divided MEWP's into these four different categories.

Manually Propelled Elevating Aerial Platforms

Self-Propelled Elevating Work Platforms

Boom-Supported Elevating Work Platforms

Vehicle Mounted Elevating and Rotating Aerial Devices

400

The fuel quality for diesel-powered emergency generators must be tested to ______ standards annually.  

ASTM Standards

400

When pushing or pulling heavy loads you should identify what PPE and equipment is needed as part of your pre task planning guide. You should also _____ and _____ the _____ before moving equipment. 

Plan, walk, the route.

400

What is the name of additional heat required to warm the water in a hydronic system?

Pickup

500

These placards are part of what classification system. 

The DOT or Department of Transportation Hazard Classification System

500

Monthly tests for diesel-powered emergency generators are conducted with a dynamic load that is at least 30% of the nameplate rating. If we cannot meet the 30% of the nameplate rating then we must test the generator every 12 months using supplemental loads of ____% of the nameplate rating for 30 minutes, followed by ____% of the nameplate rating for 60 minutes. 

50% and 75%

500

Last month at the All Hands Safety Meeting we covered three GWP's. They were Avoiding Injury in the Office, Shortcuts and Poor Work Practices, and ???

Combating Heat Related Illness.

500

The temperature range of a medical freezer in Celsius. 

What is -15 - (-19)* Celsius?