True or False: The recommended height for a flood cut is exactly 2 feet.
Answer: False (It should be 2 feet and a quarter inch.)
True or False: Leaving removed items scattered on the job site is an effective way to manage waste.
Answer: False (Organization is essential for efficiency.)
True or False: Chalk lines are useful for achieving straight cuts in renovation work.
Answer: True (Chalk lines help maintain accuracy.)
True or False: A proper 4ft cut should be exactly 4 feet in height.
Answer: False (It should be 4 feet and a quarter inch.)
True or False: The mitigation phase is unrelated to the reconstruction process.
Answer: False (They are closely linked.)
When cutting drywall near a tiled backsplash, how much drywall should you leave?
A) 0 inches
B) 1 inch
C) 2 inches
D) 4 inches
Answer: D) 4 inches
True or False: Saving items like outlet covers is a prudent practice during mitigation.
Answer: True (It helps reduce waste and assists in reconstruction.)
What is a visible sign that a chalk line was not used correctly?
A) Straight cuts
B) Curved cuts
C) Neat lines
D) Clean edges
Answer: B) Curved cuts
What potential issue arises if a flood cut is too short?
A) Easier access for repairs
B) Increased dust
C) Additional cuts may be needed
D) Fewer materials needed
Answer: B) Increased dust & C) Additional cuts may be needed.
What should the mitigation team ensure for a smoother transition to reconstruction?
A) Discard all items
B) Provide clear documentation of saved items
C) Leave the site in disarray
D) Complete demolition as quickly as possible
Answer: B) Provide clear documentation of saved items.
Why is it important to avoid cutting right to the edge of a door jam?
A) It will affect the overall appearance
B) You need to leave space for splicing
C) It can lead to structural issues
D) Only novices do that
Answer: B) You need to leave space for splicing
Which of the following is a critical item to keep during demolition?
A) Old newspapers
B) Outlet covers
C) Personal items
D) Unused tools
Answer: B) Outlet covers
Why is maintaining neat cuts important in demolition?
Answer: Neat cuts ensure a smoother reconstruction process and a professional appearance.
What should you do with power cords once they are removed?
Answer: Place them in a designated storage box or plastic labeled bag to prevent loss.
Why is it important to maintain open communication between the mitigation and reconstruction teams?
Answer: To ensure all details are accurately conveyed, preventing miscommunication and delays.
What is the ideal angle for making straight cuts in drywall?
A) 45 degrees
B) 90 degrees
C) 180 degrees
D) 360 degrees
Answer: B) 90 degrees
When removing multipile layers, why is it essential to take detailed photographs?
Answer: To assist with documentation and ensure proper reconstruction.
What can result from an imprecise demolition job?
Answer: Increased labor and material costs for the reconstruction phase. Or changing google review.
Which of the following items must be photographed and handled with care during removal?
A) Waste material
B) Countertops
C) Old tools
D) Flooring
Answer: B) Countertops
What is a common consequence of poor coordination between mitigation and reconstruction teams?
Answer: Increased costs and extended project timelines due to misunderstandings.
What can happen if you do not use chalk lines for your cuts?
Answer: The cuts may be irregular, leading to a poor fit for new drywall.
Why is it important to photograph countertops before and after removal?
Answer: To maintain a record that proves the condition prior to the removal and to avoid disputes.
What is the primary goal of precise demolition techniques?
Answer: To facilitate efficient and effective reconstruction.
What is the importance of saving labeled samples of flooring materials?
Answer: Itel samples can be sent out and proper flooring type ordered for customer.
How can the mitigation team help the recon team avoid unnecessary expenses?
Answer: By saving and accurately labeling all reusable items from the site.