Demo Detectives
Waste not, Want not
Precision Pro
Save the Day
Recon Connection
100

True or False: The recommended height for a flood cut is exactly 2 feet.

Answer: False (It should be 2 feet and a quarter inch.)

100

True or False: Leaving removed items scattered on the job site is an effective way to manage waste.

Answer: False (Organization is essential for efficiency.)

100

True or False: Chalk lines are useful for achieving straight cuts in renovation work.

Answer: True (Chalk lines help maintain accuracy.)

100

True or False: A proper 4ft cut should be exactly 4 feet in height.

Answer: False (It should be 4 feet and a quarter inch.)

100

True or False: The mitigation phase is unrelated to the reconstruction process.

Answer: False (They are closely linked.)

200

When cutting drywall near a tiled backsplash, how much drywall should you leave?
A) 0 inches
B) 1 inch
C) 2 inches
D) 4 inches

Answer: D) 4 inches

200

True or False: Saving items like outlet covers is a prudent practice during mitigation.

Answer: True (It helps reduce waste and assists in reconstruction.)

200

What is a visible sign that a chalk line was not used correctly?
A) Straight cuts
B) Curved cuts
C) Neat lines
D) Clean edges

Answer: B) Curved cuts

200

What potential issue arises if a flood cut is too short?
A) Easier access for repairs
B) Increased dust
C) Additional cuts may be needed
D) Fewer materials needed

Answer: B) Increased dust & C) Additional cuts may be needed.

200

What should the mitigation team ensure for a smoother transition to reconstruction?
A) Discard all items
B) Provide clear documentation of saved items
C) Leave the site in disarray
D) Complete demolition as quickly as possible

Answer: B) Provide clear documentation of saved items.

300

Why is it important to avoid cutting right to the edge of a door jam?
A) It will affect the overall appearance
B) You need to leave space for splicing
C) It can lead to structural issues
D) Only novices do that

Answer: B) You need to leave space for splicing

300

Which of the following is a critical item to keep during demolition?
A) Old newspapers
B) Outlet covers
C) Personal items
D) Unused tools

Answer: B) Outlet covers

300

Why is maintaining neat cuts important in demolition?

Answer: Neat cuts ensure a smoother reconstruction process and a professional appearance.

300

What should you do with power cords once they are removed?

Answer: Place them in a designated storage box or plastic labeled bag to prevent loss.

300

Why is it important to maintain open communication between the mitigation and reconstruction teams?

Answer: To ensure all details are accurately conveyed, preventing miscommunication and delays.

400

What is the ideal angle for making straight cuts in drywall?
A) 45 degrees
B) 90 degrees
C) 180 degrees
D) 360 degrees

Answer: B) 90 degrees

400

When removing multipile layers, why is it essential to take detailed photographs?

Answer: To assist with documentation and ensure proper reconstruction.

400

What can result from an imprecise demolition job?

Answer: Increased labor and material costs for the reconstruction phase. Or changing google review.

400

Which of the following items must be photographed and handled with care during removal?
A) Waste material
B) Countertops
C) Old tools
D) Flooring

Answer: B) Countertops

400

What is a common consequence of poor coordination between mitigation and reconstruction teams?

Answer: Increased costs and extended project timelines due to misunderstandings.

500

What can happen if you do not use chalk lines for your cuts?

Answer: The cuts may be irregular, leading to a poor fit for new drywall.

500

Why is it important to photograph countertops before and after removal?

Answer: To maintain a record that proves the condition prior to the removal and to avoid disputes.

500

What is the primary goal of precise demolition techniques?

Answer: To facilitate efficient and effective reconstruction.

500

What is the importance of saving labeled samples of flooring materials?

Answer: Itel samples can be sent out and proper flooring type ordered for customer.

500

How can the mitigation team help the recon team avoid unnecessary expenses?

Answer: By saving and accurately labeling all reusable items from the site.

M
e
n
u