REGULATE THIS
STUDY HALL
DODGING ARROWS
YOU WANT WHAT, WHEN?
CALIFORNIA DREAMING
100
This is the entity that dictates the Federal Regulatory Requirements
What is the FCC
100
this study is performed to check for lonely plants and animals
What is an Endangered Species study
100
We need to consult with Native American Tribes when we install this kind of pole
What is a new pole
100
This is when you should let the DRS know about the project
What is when you have the confirmed RFAF
100
In addition to Federal Regulatory requirements, we may also have to consult this entity in the State of California
What is PUC
200
We consult with this agency to determine Historical Significance
What is SHPO
200
This study is performed to check for "soggy bottoms"
What is a Wetlands study
200
We pay a ______ fee to each interested tribe
What is a review fee
200
This is what the DRS needs to start the regulatory process
What is the Regualtory spreadsheet and node drawings
200
An official submittal and request for review must be sent to the PUC for all projects that include this type of activity.
What is any ground disturbance
300
This acronym is commonly used when referring to Native American consultation
What is TCNS
300
This study is used to check historic water levels
What is a Floodplain study
300
Native tribes are also paid a review fee for each pole (new and existing) located in this type of District
What is a Historical District
300
This is how long the regualtory process takes for existing poles not in a historic district
What is 30 days
300
Each submittal must sontain these 2 reviews
What is an archeological and biological review
400
Filing a notice through this agency will tell us if there is the possiblity of interferring with navigational equipment
What is FAA
400
You would use this review to check for the homesteads and landmarks
What is a SHPO review
400
Tribes have this many days to respond to our request for approval.
What is as long as they want
400
This is how long the regulatory process takes for new poles
What is 90-100 days
400
This is the amount of time is takes for PUC approval once the package has been submitted
What is 21 days
500
This study will determine if detuning measures are required
What is an AM Study
500
This is what you get when all your studies are complete
What is a Regulatory Notice to Proceed (RNTP)
500
This is the definition of TCNS
What is Tower Construction Notification System
500
This is how long it takes for existing poles in a Historic District
What is 90-100 days
500
You are dreaming if you think you can start construction prior to receiving this.
What is an RNTP