100
This phase of a project requires different 'hats'
What is Preconstruction
100
Reviewing the General Conditions is the first step during this phase of Preconstruction
What is Contract Documents
100
This is the first action taken during the Construction phase
What is Mobilization
100
Recommend Basic Materials and Systems vs. Conduct Site Evaluation
What is Conduct Site Evaluation
100
These are the words represented by the acronym EEO in EEO Program
What is Equal Employment Opportunity
200
This hat is worn during design development
What is The Judge Hat
200
Conducting a Site Evaluation falls within this phase
What is Conceptual Planning
200
These arise during construction after an agreement to alter the original scope of work
What are Change Orders
200
Evaluate and Finalize Structural Systems vs. Present Design Development
What is Evaluate and Finalize Structural Systems
200
This is usually a percentage of the contract value set aside for unpredictable changes in the scope of work or unexpected cost
What is Contingency
300
The 'Artist Hat' is worn during this stage of preconstruction
What is Schematic Design
300
Identifying long lead purchase items occurs during this phase of pre-construction
What is Schematic Design
300
These documents are submitted to the owner during Closeout (list two)
What are O&M Manuals and As-Built Drawings
300
Award Trade Contracts vs. Mobilization for Construction
What is Award Trade Contracts
300
The stage in the Project when the Work is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use
What is Substantial Completion
400
The 'Explorer Hat' is worn during this phase of Preconstruction
What is Programming
400
Evaluating and Finalizing MEP systems occurs in this phase
What is Design Development
400
According to the AGC checklist, during construction there are four 'programs' that are administered by the GC. Name Two
What is Safety Program, Security Program, EEO Program, Quality Control Program
400
Submit Operation Manuals and Warranties vs. Conduct Final Inspection
What is Conduct Final Inspection
400
The process of reducing costs without decreasing functionality
What is Value Engineering
500
This hat is worn when you're carrying your idea into action (CD)
What is The Warrior Hat
500
This phase falls between Design Development and Construction
What is Bidding and Award
500
Progress of a project is generally monitored and evaluated by the _____________ and the schedule is updated accordingly by the ________________.
What is Superintendent; Project Manager
500
Develop Bid Package Format vs. Present Schematic Design Report to Owner
What is Develop Bid Package Format
500
Square footage, rough estimate, needs/wants, occupancy levels etc. are all part of this.
What is the Building Program