300
What is a Controller Required to do prior to ordering an operation of live-line connectors?
The Controlling Authority shall determine whether:
a. the connector (loop) is being removed entirely, or
b. the connector is being removed at one end only, and tied back to the conductor, or
c. the connector is being removed at one end only, and connected to ground (ie. to the structure)