ITIL
BA Concepts
The Executive Summary
Implementation
Features
100
the analysis steps and documentation meant to be used as checklist of items for the BA to consider as the project progresses; the intention is not to prescribe all of these items for every project
What is "the Noble Path"
100
The specification of a sequence of actions that a system can perform interacting with actors of the system
What is Use Cases?
100
A introduction that explains the nature of a project
What is the Overview?
100
Action to reduce risk implications
What is mitigate?
100
Technique used to detect missing functionality
What is Traceability ?
200
the objectives are to develop the business case for the project, establish project and product scope and to explore solutions, including the preliminary architecture
What is "Initiation Phase"
200
A process used for checking the work performed by a colleague
What is a Peer Review?
200
Details of the why the project is being considered
What is the Background?
200
A possible event that could cause harm or loss or affect the ability to achieve the objectives
What is Risk
200
it is often used more than once
What is Reusable?
300
Manage and coordinate the processes, systems, and functions required for the deployment of a release into production
What is Close out phase?
300
A plan for "what can go wrong"
What is Risk Management
300
Includes recommendations on how to proceed
What is Proposed Strategy?
300
A process for identifying, planning for and mitigating
What is Risk Management
300
If this is going to get off the ground a process or ..... is going to be needed
What is a workflow?
400
Finish the analysis, and design, code integrate and test the software
What is Construction Phase?
400
To work backwards from the final product in order to derive its underlying analysis and design models
What is Reverse engineering
400
This section describes the roles played by the project team members and stakeholders and is usually in a chart format
What is RACI?
400
To group a set of related tasks and techniques
What is Knowledge Area KA?
400
Tracking for document iterations
What is Version Control?
500
Perform final testing before transitioning into production
What is Final V&V?
500
a .... will help determine the critical root causes to address in an IT project
What is a Pareto Chart?
500
It is really important for tracking changes to any document
What is Version Control?
500
To control the life cycle of all changes
What is Change Management?
500
We need to cause change; make different; or transform
What is Customize?
M
e
n
u