This is the very first step of logical analysis, where you figure out exactly what your bosses or the situation requires you to do.
Confirm the task
If you are actively assigning Cadet A to sweep the floor and Cadet B to count the inventory, you are operating within this specific step.
Step 7: Implement the solution
True or False: Brainstorming alternate solutions means the leader must use every single idea brought forward by the team
False? (The leader gathers ideas in Step 4, but filters and narrows them down to the best one in Steps 5 and 6)
True or False: Brainstorming in Step 4 means you should instantly reject silly or unrealistic ideas the second they are said out loud.
False (In Step 4, you welcome all ideas without judgment; you filter out the bad ones later during Step 5)
According to the lesson plan, this action must be done by everyone when another cadet is speaking, ensuring no one gets cut off or ignored.
listening respectfully
This step requires you to look at your options and grade them based on simplicity, safety, flexibility, and resources.
Step 5: Compare alternatives
Asking your team, "What did we learn from this that we can use next week?" is a prime example of this step.
Step 8: Evaluate the plan and implementation
If your chosen solution completely fails halfway through execution, you shouldn't panic; instead, you should pivot back to this step to look at your backup choices.
Step 4 or Step 5
True or False: Step 3 (The Critical Factor) is always the biggest, most obvious problem on the surface.
false?(The critical factor is often a hidden root cause, not just a surface symptom)
This is the Golden Rule of cadet debate: It is completely fine to disagree with a teammate's idea, but you must never attack the. . . .
person
This final step happens during and after your plan is put into motion to see if it actually worked or if new problems popped up.
Step 8: Evaluate the plan and implementation
Before a single cadet moves a muscle to execute the solution in Step 7, the leader must ensure the team has a clear, step-by-step understanding of the . . . .
execution/action plan
These are the four specific criteria used in Step 5 to judge whether an alternative solution is actually viable.
Simplicity, Safety, Flexibility, and Available Resources
True or False: Evaluating the plan (Step 8) only happens after the entire task is completely finished.
False (Evaluation happens both during execution to make live fixes, and after to find long-term lessons)
To prevent one or two loud cadets from taking over the entire project, a peer leader must proactively do this for the quieter members of the group.
encouraging/pushing everyone to contribute
In this step, you specifically look for the "symptoms" vs. the root cause of an issue, and you outline all the roadblocks standing in your way.
Step 2: Identify the problem
If you discover a flaw in your plan while your team is executing it, adjusting your actions on the fly is part of this step's ongoing process.
Step 8: Evaluate (Evaluating dynamically during implementation).
When applying Step 5 (Compare alternatives), if two solutions appear equally safe and simple, this criteria measures how easily your plan can change if something goes wrong.
Flexibility
True or False: A peer leader should assign individual roles and tasks to team members during Step 7 (Implement the solution).
True
Doing this physical action before speaking during a formal guided discussion ensures order and stops people from yelling over each other.
raising your hand
This is the exact step sequence where a team shifts entirely from abstract brainstorming into making a final decision and mapping out assignments.
Step 6 (Determine the best solution) and Step 7 (Implement the solution)
During the evaluation phase (Step 8), a peer leader must conduct this specific type of group discussion to systematically review what went right, what went wrong, and how the team can improve.
a debriefing
This trap happens when a group assumes a previous plan will work flawlessly for a new scenario, entirely skipping Step 1 (Confirm the task) because they think they already know what to do
making assumptions / failing to confirm the task
true or false If a group picks a solution simply because the loudest cadet suggested it ignoring safety or resource limits it is okay to do
false you need to go through Step 6: Determine the best solution you need to make sure a plan is safe and you have what you need to do it
When comparing alternatives in Step 5, this is the most non-renewable and strictly limited resource that a cadet leader must account for, especially when a task must be completed before the final parade or lights-out.
time