History
Construction
Tunnel
Train
Varia
100

Beneath what place was the tunnel built?

What is English Channel?

100

How many tunnels were built there in total?

What is 3 tunnels?

100

How long is the tunnels entire length?

What is 50,45km? (but 50 will suffice)

100

What was the trains top speed? 

What is 160 km/h?

100

When was the Channel tunnel proposed?

What is 1802?

200

From where does it begin?

What is Coquelles?

200

What machine was used to make the tunnel?

What is tunnel boaring machine?

200

How long is the tunnel underwater?

What is 37,9km? (but 40 will suffice)

200

What trains were used in the past?

What is Le Shuttle?

200

What is the service tunnel for?

What is "for emergency and service"?

300

Where does it connect to?

What is Folkestone?

300

How many tunnel boring machines were used to dig the Channel Tunnel?

What is 11?

300

What is the deepest point of the tunnel?

What is 75m?

300

What trains are used now?

What is Eurostar?

300

Who was the first person to ride in the Eurotunnel?

Who is Elizabeth 2?

400

When did the tunnel open?

What is 1994?

400

How much did the whole construction cost?

What is £4.56 billion? (but £4.5 billion will suffice)

400

How long does the trip from one side to other take?

What is 34 minutes?

400

How many trains travel through the tunnel in a day?

What is 400?

400

How many people were stranded in the tunnel on the 18th of Dec. 2009?

What is 2000?

500

What company is the owner of the tunnel?

What is Groupe Eurotunnel?

500

When did they start with the construction?

What is 1987?

500

Where is the longest underwater tunnel?

What is Japan?

500

What was the biggest train malfunction, involving how many trains?

What is 5 trains?

500

How many fires have been in the tunnel?

What is 3?