What does RWMBA stand for?
Risk Management By Walking Around
Who signs off a commlog?
SURPRISE: The blue arrow button in Cell Fusion can be used to “un-green” an operation. Ture or False?
False
Define 'MRB'
Material Review Board
What is the fastest way to view a Schematic for a 03-354512-00 cable?
Search 76-354512-00 in KM Matrix (Change '03' to '76' straight up)
Where is the Athletic Trainer located?
Building F, second floor. Thank you.
Before submitting a Comm Log, you need to have a problem statement, a list of ____________ steps completed, photos, and necessary documentation.
Troubleshooting
What Cosmetic Classification is a surface finish with no decorative cosmetic value?
Class C.
A = highly decorative
B = moderately decorative
AA = critical in functionality (not on the exam, who cares)
KM Matrix will show quantity of a part. True or False?
What zip tie color is used in the process areas where they may be exposed to chemicals?
Green zip ties.
Black - Electrical areas (Ex. Inside LPB's and controllers)
White - Everywhere else.
When the facilities' AC power cable is not in use, due to the bay being empty, it must be locked out with what color lock?
Blue Lock (Custodial lock, Lead lock) Thank you.
You can find what operation a part is released using what transaction code on SAP?
ZR101 (Also can be used for viewing shortages and your tool's item number)
This member is certified to accept or fail a cosmetic defect......
QA technician.
An MRB disposition request is submitted through...
QuickBase
A part was delivered to your bay. How would you verify the part belongs to your tool?
Open SAP and verify part belongs on your tool's BOM.
What is a pinch point?
This type of hazard occurs when a body part can get caught in between two objects.
What application(s) and command(s) are used to order parts?
SAP and ZMTTCREATE
Who 'green-tags' your tool when PSA auditing has been completed?
Your Supervisor (Not Lead)
What is the name of the software used in our User Interface (UI) that allows a technician to control the system modules?
Proteus (Not Prometheus)
When performing daily standard work, Cell Fusion instructions state to use 6 feet of poly. After starting the op, you realize that 5 feet is quite sufficient. What you should do about it?
Write a redline and state why 5 feet of poly is sufficient.
When needing to perform non-standard work of installing a reworked plating power supply in test. What should you do?
Write a SAFE Permit!
If a disconnect list update is required, the process to have it updated is....
Submit a Comm Log with attached updated disconnect list template!
What audit includes functional inspections, interlock verification, administrative, cosmetic and workmanship before the system is powered down and DEFACILITIZED?
FSA
Name ALL systems within HVM Sabre.
Anneals/HTFE, Sabre, Sabre 3D, FI/PPT
All Assembly Technicians are authorized to perform rework on ENERGIZED systems. True or False?
False, no Assembly Technicians are authorized unless assembler is working with a test technician and a SAFE permit was completed.