professions
tools
interior finishing and phases
verbs used in interior work
Enter Category Name
100

I install the wiring, outlets, and circuit breakers that provide power to a building.

electrician

100

This manual tool has a heavy  metal head and a handle. It is usually used with nails.

hammer 

100

During Phase 1, this specific liquid is applied to walls and ceilings to prepare them for the final paint color.


primer

100

This verb describes the process of putting down tiles, floorboards, or bricks on a flat surface.

to lay

100

A stand-alone residential building that is not physically connected to any other structure.

A detached house

200

I repair or replace the shingles, tiles, or metal sheets on the top of a house to keep it waterproof.

roofer

200

This hand tool is used by bricklayers and plasterers to spread, smooth, or move mortar and plaster.

trowel

200


In which phase are the tiles laid?

 (phase - 1 preparation and wet, phase 2- installation and trim work or phase 3 final fix and handover)

phase 1

200

To assemble or put up a vertical structure, such as a scaffold or a stud wall.

to erect or build

200

This a single-storey house.

A bungalow

300

I read blueprints to install the glass in windows, doors, and storefronts.

glazier

300

A heavy-duty tool used for breaking up old concrete or pavement, often powered by compressed air.

a jackhammer

300

When are Internal door frames  fitted into their openings? 

Phase 2

300

The action of connecting a building or a room to the electrical grid or installing internal cables.

to wire

300

A row of houses joined together by shared walls on both sides.

Terraced houses

400

I use heavy machinery like excavators or bulldozers to clear and level the ground before building starts.

machine operator

400

I specialize in pouring, smoothing, and finishing the foundations, sidewalks, and floors of a structure.

a spirit level

400

These two specific wooden trim elements are installed in Phase 2: one goes around the floor and the other around doors.

Skirting Boards (Baseboards) and Architraves

400

After a surface is dry, you perform this action with abrasive paper to make it perfectly smooth for painting.

to sand

400

This refers to one of a pair of houses joined together by a shared wall on only one side.

A semi-detached house

500

I specialize in pouring, smoothing, and finishing the foundations, sidewalks, and floors of a structure.

mason / bricklayer

500

Used by carpenters or plumbers to hold two pieces of material together tightly while they are being joined or glued.

clamp

500

This is the final document compiled during Phase 3 that lists all small defects needing to be fixed before handover.

Snagging List

500

This is the action of applying a thick, protective layer of cement or lime mixture to an exterior or interior wall.

to render

500

Located either entirely or partially below ground level, this floor often requires an "areaway" for light.

A basement

M
e
n
u