The maximum recommended speed for towing a Mobile Unit on the highway?
What is 65 mph
Can you save a mobile mounting structure from tipping, falling, or rolling with your body?
No. No you can not. Do not attempt.
What should you include in a work order's notes before closing the work order?
- Pictures of the trailer
- Detailed description of the work you performed
Adding a new agent in ServiceNow can be performed by who?
The company manager or manager of the "assignment group"
The camera and “brains” of the LVT product are located at the top of the mounting structure within a tripod mount casing. What is this part of the mobile surveillance structure called?
The Live Unit
This is the URL of the website that displays safe locations to dispose of fuel?
What is
www.earth911.com
If you arrive at a location and you cannot find the MSU what steps should you take?
1. Verify with POC if their contact info is listed
2. If the POC is not listed call support and ask to verify location
3. If the unit is not at the location leave detailed notes/pictures proving you are onsite
4. Close task as incomplete after talking with tech support
True or False? - It is ok to close all completed work orders when you finish the day
False - All work order should only be closed by the technician that performed the work while onsite
How many batteries are in an EFOY Live Unit?
4
These are the three items of PPE that are needed to perform MSU work for LVT?
What are -
Hard hat (class C, HV)
Eye protection that provides proper shade and side protection
Visibility vest (minimum Type R, Class 2)
If you are deploying an EFOY Trailer from your lot for a new setup you need to make sure that the unit has this on it before delivering and setting up the unit.
All cartridges must be full before delivery
MET stand for?
What is Mast Enhancement Tool
When cranking down a mobile mounting structure's mast, where should one stand in relation to the crank?
Stand directly in front of the mast in case of the unlikely event that the mast cable breaks
You have a work order assigned to you that is 3 hours away from your business location. What should you do?
a. Reject the work order and let dispatch know that this is outside your territory
(If you are unable to service the location)
b. Reach out to dispatch and make sure that this was appropriately assigned to you and work out how much it would cost you to perform the work
(Get all approvals in writing for invoicing purposes)
What is the best way for a partner to measure if they are completing work on time in ServiceNow?
Work is completed before the "End Window" expires
This is the weight of the mobile unit?
What is 1,800 lbs
What are the 2 steps for properly and safely rotating a unit by hand?
DO NOT move the unit by hand over any distance. The wheel of the tongue jack is only for rotating the unit.
Front outrigger legs MUST be extended, with the jacks no more than 2 inches off the ground, while rotating a unit by hand.
What are the charge controller settings for AGM units?
Absorb
- 29.0V
- Time 120M
FLT
- Volts 26.4
Advanced
- ENDAMPS 0.0A
- REBULK 25.0V
INPUT MENU
MODE
- SOLAR ON
SETUP
- SWEEP INTERVAL 3MIN
LOAD MENU
FUNC
- MANUAL ON
SETUP
LOW BATT 22.6V
- RECON 24.0V
There is an LVT app coming out in the near future. Where will you access the app?
In the work order for a setup