Before starting any welding or cutting of steel, this document is needed from the plant
What is a Hot Work Permit
I do this before crossing (2) paths with machinery
What is Eye Contact and Visual Confirmation
Before a lift is used on site, the operator must ensure that this inspection certification has been done?
Before working on an energized system, I need this proper practice in place
What is Lock Out/Tag Out
Using a ladder, this needs to be maintained while ascending or descending
What is 3-point contact
Each prime (Teir 1) contractor requires a minimum of one of these per shift
What is a Health & Safety Coordinator
I am the maximum speed limit of our construction site
What is 10 km/h
I am a spotter of some MEWPs (lifts), I am able to take care of up to 3 of these within what distance?
1 Bay / A Bay
The document is needed before working on the facilities electrical distribution system or cutting cables over 100 amps
What is a Ford Electrical Permit
On a roof, this soft barrier is used to identify that fall protection is required beyond it
What is a bumpline
Where would someone find the necessary notification contacts when an incident occurs?
What is the Emergency Call Tree
I am a visual marker who lets other workers know that I am ensuring the safe operation of a lift on site.
What is a Spotter Cap
Before I become a spotter for a MEWP (lift), I need to be trained in what?
What is the ground controls of the machine
If this object is missing from an extension cord, I should be unplugged, tagged and removed from service
What is a grounding pin
On a deep excavation or trench, this distance from the leading edge is required to be maintained by a physical barrier not capable of withstanding 200lbs of force
What is 6ft from the leading edge
What is 5 days
The distance a pedestrian should maintain between themselves and an active forklift
2 ft rule / 2-ft
As an operator, I must use this to an engineered anchor point to prevent me from getting ejected from the lift
What is an adjustable lanyard or SRL
The distance needed to be maintained between a MEWP/Lift, Scaffold or other conductor and an energized ventilated buss duct?
What is 4 ft (1.2m)
Between this height, the top rail of a guardrail must be installed
0.9m (35 inches) to 1.1m (43 inches)
How many Gallons / Litres of spilled fluids from a machine is reportable to Ford?
What is 5 Gallons
A document outlining shipping and handling of process equipment
What is w-KA1 and w-KA2
A MEWP must never be elevated outside when wind conditions exceed how many miles per hour or kilometers per hour?
What is 30 miles per hour or 45 kilometers per hour
A visual aid indicating the installation and commissioning status of process equipment
What is a ProTag system
The fall clearance required to be able to use a regular 6 ft lanyard with shock absorber
What is 17.5 ft