Forecast Fundamentals
Historical Forecasting
Rate Per Day (RPD)
Backlog
Forecast Adjustments
100

The system that forecast is loaded into for buy parts.

What is MRP?

100

The amount of consumption normally reviewed to create a historical forecast.

What is 365 days?  

100

The group(s) that provides production rates before Purchasing’s review.

What is Finance and/or Manufacturing?

100

The placeholder ship date assigned to unscheduled sales orders.

What is 09/09/2099?  

100

The only adjustment type that can have multiple active entries for per part, per site.

What is a Dynamic Change?  

200

The type of parts whose forecast is generated but not loaded into forecast buckets.

What are Make Parts (VI)?  

200

The project date used to determine how long an item has been in production.

What is the Production Release (PR) date?  

200

The structure used to connect components to top-level products for RPD calculations.

What is the Bill of Material (BOM)?

200

The time before backlog demand starts being loaded.

What is two weeks?  

200

The adjustment used when future demand should follow only sales-rate projections.

What is an RPD Override?

300

The field that determines whether a part is considered a buy part.

What is the Buyer Group?

300

The forecasting method applied to newly released products.

What is NPI Logic?  

300

The frequency at which RPD calculations are refreshed.

What is weekly?  

300

These two data types keep backlog from being loaded on a day based on Max production capacity.

What is loaded demand and forecast?  

300

The adjustment commonly used to remove demand caused by a transaction error.

What is a Static Override?

400

The purchasing buyer group that prevents forecast from loading.

What is 6666?  

400

The board identification structure used to preserve consumption history between PCB revisions.

What is a Basespec?  

400

When RPD data is unavailable, the system continues using this.

What is Historical forecast?  

400

The type of order that becomes backlog when it has open quantity and a placeholder ship date.

What is a sales order?  

400

The maximum duration allowed for an adjustment.

What is 365 days?

500

The person(s) responsible for maintaining forecast adjustments and root cause of the associated parts.

What is Purchasing buyer?

500

The amount of buckets used for a product with a coverage group of 365-07s.

What is 86?  

500

The data set used as input to load RPD demand at a top level.

What is Manufacturing (MFG) Grouping?  

500

The structure referenced to generate component demand from backlog.

What is the Bill of Material (BOM)?  

500

The override reason that requires additional information and often used by NPI.

What is ECO affected increase/decrease?