This happens when the time frame between two stacks exceeds 30 minutes.
What is an aging gap?
This is the max number of cells the MES system will let you delete.
What is 32?
This term refers to any product that does not meet specifications and must be removed.
What is NG (Non-Conforming Materials)
This PPE must be worn any time you enter the production floor.
What are Safety Shoes & Glasses
This should be checked off by GC Operators daily to ensure a clean GC.
What is the 6S Check Sheet
If not deactivated this will alarm when any foreign object crosses it.
What is a Light Curtain?
This is how you verify the assembly sent quantity for any given lot.
What is PD200
This is the primary reason pre-op trays are run each shift.
What is catch defects early?
The equipment must be taken to the designated evacuation area during an emergency.
What is the Muster Point Backpack?
This location houses broken and unnecessary items.
What is the Red Tag
This aging status usually means a lot is done aging but not unlocked yet.
What is wait for assign destination?
This tab is primarily used for tray maintenance.
What is F7?
This is the process of tracking repeated misses to find patterns and eliminate root causes.
What is a Pareto?
These must remain clear and unblocked at all times to allow safe evacuation in emergencies.
What are the Evacuation Routes?
This must be done if any 6S changes are made to a zone.
What is update the zone standard?
This tab is used to find any 999s as well as monitor active GC movement.
What is Current Transport Data Maintenance?
This tab is for verifying flow patterns.
What is F5 on the Sub-Menu?
This type of waste occurs when quality issues cause rework or retesting.
What is Rework Waste?
This term refers to stopping work when something appears unsafe or unclear.
What is Stop Work Authority?
The expected response when a team member notices a safety or 6S deviation?
What is correct or escalate?
This is used to access the Transport Monitor Screen.
What is the CV Index?
This flow is used when trays are removed from first charge before they finished.
What is a Re-Input?
Before starting any task, this should be confirmed on the SOP/SWI to make sure you're following the latest approved process.
What is the current revision number?
This is the correct escalation chain when a fire-related battery event occurs.
What is Notify the Lead - Supervisor - Safety - Tesla Fire Team?
This 6S step ensures tools and materials are returned to their marked locations, reducing wasted time.
What is Set in Order?