How long is an equipment package good for?
A. 24 Hrs
B. 30 Days
C. 6 Months
D. All the above
D. All the above
What does Batch A means?
Brand new, out of the package
Yes/No: Can you edit your SLOC name in Stock/Pool?
No (only in ZPBOSTRUC MRP Area)
Show how to create a lateral transfer?
ZPBOWKBH, Lateral transfer, Issue, Create PR, Plant, SLOC, and Execute.
Explain how to pull your component listing.
ZUSMENU, Property Management, MAT_SIT, UIC, 0-0_DOWN, select Execute, right click, Print Component Hand Receipt.
Where can you go to view your equipment package?
ZPBOSTRUC
What does DLA stand for and what does it mean?
Date of Last Activity
The last time the equipment had action taken on it.
What movement type is used to bring equipment onto the books?
501
Show how to update your storage bin?
ZUSMENU, MAT_SIT, UIC, Execute, Right click on the material situation page, Sto. Bn/Bench Stock/Local Repair.
Explain how to find your CDR and Provisional SLOCs.
ZUSMENU, Property Management, ZPBOSTRUC, UIC (the AA), click the node to the left of the UIC, select the PB UIC, select the Navigation View icon (at top)
How would you know that the status of the loan package has changed?
By looking at the Loan status column
Yes/No: Can the Supply Rep generate the monthly inventory.
No. (only the APO will generate inventory and the Supply Rep can pull them).
True/False: Serial number profile for GANO means the serial number is required.
False (Not required)
Walk me through the process of completing a final issue.
MB25 (Collect reservation#), MIGO 201/221, type reservation number (beside R09 reservation block), Execute
Explain process to create a reservation.
ZUSMENU, Reservation, MB21, Movement Type, Plant, New Items, SLOC, Good Recipient, Material, Qty, etc...
When the EPA number populate what status do you receive?
Active
What is one reason to use ZPBOSTRUC?
To locate your SLOC and/or DoDAAC.
What does MIGO mean?
Movements In, Goods Out.
True/False: A Supply Rep can convert a PR to a PO.
True (only with a written memo from the APO).
Explain how to create an Equipment Package.
ZUSMENU, PFEM, ZEPA, enter MTOE (UICPB), Date Range, and Execute.
What is one of two reason codes for loaning out property?
Temp Loan
Sub HR
What is the difference between Accountability and Responsibility?
Accountability: Obligation imposed by law
Responsibility: Obligation of an individual
When a component shortage is discovered for an end item, what work order type is created to prompt the system to generate a reservation to fulfill the shortage.
PB01
True/False: You can use ZMB59 to view a complete transaction.
True (locate the document number, movement type, and the Activity Log).
Explain how to print a component hand receipt.
MAT_SIT, UIC, right click, Print Component Hand Receipt, select all, Component Type (COEI, BII, AAL), Print Options (with Illustrations and Long text)