01 78 00
Closeout Submittals
SD-01, examples includes surety bonds, QC plans, and submittal register
Preconstruction Submittals
The primary individual authorized to make changes to the contract
Contracting Officer
This term refers to outstanding QC items that are tracked in RMS until they are corrected.
Deficiencies
01 35 26
Governmental Safety Requirements
SD-04, includes physical examples of materials or equipment.
Samples
The RIF, ACPs, and VCC Parking are also known as this 4-word phrase for certain contract designations.
Small Business Set Asides
Full name for the EM 385-1-1
Safety and Health Requirements Manual
01 33 29
Sustainability Requirement
SD-03, examples include catalog cuts, illustrations, and schedules
Product Data
The IPO is an example of this type of contract (not construction).
Commercial Services
Safety document that must be prepared before beginning each activity, task or definable feature of work.
Activity Hazard Analysis (AHA)
01 91 00.15
Total Building Commissioning
SD-06, includes reports signed by authorized officials of a laboratory that examines material.
Test Reports
Phrase commonly used when referring to the inclusion of FAR clauses in the contract by only listing the clause number and not by full text.
Incorporated by Reference
Name all 3 phases of control in correct order.
Prepatory, Initial, and Follow-up
01 57 19
Temporary Environmental Controls
SD-07, includes statements printed on the manufacturer’s letterhead and signed by responsible officials of the product manufacturer
Certificates
$17,500 per day
Liquidated Damages
ENG Form 3394 and OSHA Form 300 are used to report these (01 45 00.15 10 - Para 1.7.3.6)
Accidents