Name the Spec Section
Submittal Descriptions
Contract Terminology
QC & Safety
100

01 78 00

Closeout Submittals

100

SD-01, examples includes surety bonds, QC plans, and submittal register

Preconstruction Submittals

100

The primary individual authorized to make changes to the contract

Contracting Officer

100

This term refers to outstanding QC items that are tracked in RMS until they are corrected.

Deficiencies

200

01 35 26

Governmental Safety Requirements

200

SD-04, includes physical examples of materials or equipment.

Samples

200

The RIF, ACPs, and VCC Parking are also known as this 4-word phrase for certain contract designations.

Small Business Set Asides

200

Full name for the EM 385-1-1

Safety and Health Requirements Manual

300

01 33 29

Sustainability Requirement

300

SD-03, examples include catalog cuts, illustrations, and schedules

Product Data

300

The IPO is an example of this type of contract (not construction).

Commercial Services

300

Safety document that must be prepared before beginning each activity, task or definable feature of work.

Activity Hazard Analysis (AHA)

400

01 91 00.15

Total Building Commissioning

400

SD-06, includes reports signed by authorized officials of a laboratory that examines material.

Test Reports

400

Phrase commonly used when referring to the inclusion of FAR clauses in the contract by only listing the clause number and not by full text.

Incorporated by Reference

400

Name all 3 phases of control in correct order.

Prepatory, Initial, and Follow-up

500

01 57 19

Temporary Environmental Controls

500

SD-07, includes statements printed on the manufacturer’s letterhead and signed by responsible officials of the product manufacturer

Certificates

500

$17,500 per day

Liquidated Damages

500

ENG Form 3394 and OSHA Form 300 are used to report these (01 45 00.15 10 - Para 1.7.3.6)

Accidents