Are quantifiable measures used to evaluate progress toward specific business objectives.
PERFORMANCE INDICATOR
Mataas kung nakaupo, mababa kung nakatayo.
ASO
__ of the population in target areas benefiting from resilience investment
70%
Tinitingnan ang paraan ng pag-uunawa sa isang problema o sitwasyon sa pamamagitan ng pagtingin sa kabuuan.
SYSTEM THINKING
Ikaw na humihiwa-hiwa ay siya pang lumuluha.
SIBUYAS
___ of sub project completed in accordance with national guildelines on resilience
85%
___________________ for ecosystem conservation and protection are actions that "work with nature" to address the challenges faced'by rural communities arising from climate and natural hazards, instead of relying solely on conventional engineered approaches.
NATURE BASED SOLUTION
Nung pinasok ay matigas, nang nilabas ay malambot
Bubble Gum
A ______ is one way to fulfill the PPA requirements of an LGU budget. Every _______ is a PPA, but not every PPA(like administrative payroll or regional tourism marketing)
Community Project
often called surface water flooding, occurs when exceptionally heavy rainfall cannot be absorbed by the ground or drained away by existing infrastructure quickly enough.
PLUVIAN FLOODNG
Kung gabi ay hinog, sa araw ay hilaw.
BOMBILYA
Who are the attendees on the feedbacking to BDC on MRP meeting?
Brgy. Chairman
Brgy. Council Members
Elected Community Volunteers
CSOs and Sectoral representative
_____________ refers to a set components/activities that could be classified as any two or more categories of SPs but proposed as one single SPs that are designed to achieve a common objective within the same location or
INTEGRATED SP
Ipinasok ko ng malambot, lumabas ng matigas
Yelo
What is the meaning of "SMART" under the "Qualities of good statement of objective?"
SPECIFIC
MEASURABLE
ACHIEVABLE
RELEVANT
TIME BOUND