Scanless Decant
Freight Management
Quality/PS
Flow
DEA
100

This term refers to when decanters do not have any cases to work.

What is Starve time?

100

This is the Transportation owned tool used for freight management.

What is YMS?

100

This is the goal Sideline rate for a problem solver.

What is 115 UPH?

100

This is the target WIP buffer for your operation.

What is 60 minutes?

100

This is the dashboard to verify the current status of IOL by department in your Site.

What is Peculiar Inventory?

200

This is the tool used to monitor your Scanless Decant KPIs.

What is Vantage?

200

This is the operations tool used for backlog/freight management.

What is NYR?

200

This is triggered when the inventory adjusts due to an overage or shortage in units from decant.

What is a decant error indicator(DEI)?

200

This is an indicator of poor station staffing.

What is Increased Recirc?

200

This tool is used to track upcoming SLAs by unit.

What is Rodeo?

300

These are the 4 main Decant KPIs.

What are CPH,UPH,UPT, and GCU?

300

These are the 3 tools used to perform a yard scrub.

What are Oculus, YMS and NYR/

300

This is an item that is packaged as a group of multiple items, inside the outer case.

What is a master pack?

300

This Crossbelt sorter assigns the tote to a floor.

What is VS2?

300

This is the colorful tool used to track SLAs by trailer.

What is KIPS?

400

These are the 3 locations that feed the crossbelt.

What are the dock doors, the Pit Corral, and the jackpot lane?

400

This is the standard freight, back log level.

What is between .7 and .9 days?

400

This tool is used to view the break down of quality defects by process path.

What is Atlas?

400

This tool is used before every period and when major HC shifts occur to plan your shift operations.

What is the Decant Flow Planner?

400

This is the CUT compliance goal and when a trailer is considered compliant.

What is 90% and when it is TDR'd in before its CUT time?

500

This is how you staff your decant lines.

What is from back to front, with HC distributed as evenly as possible across the lines.

500

These are the 4 main freight KPIs that will effect your decant capacity.

What are UPC, UPT, Smalls Mix, and tote %?

500

These are the 3 exceptions processes a unit could enter after being marked as PS.

What are Damageland, Non-Con, and ISS?

500

This is the tote flow bottle neck of the operation and where it's located.

What is 36TPM at the IB Spirals?

500

This is the late to stow DPMO and IB BPS goal.

What is 13k DPMO and 2 BPS?

M
e
n
u