62
67
68
tank farm etc.
misc.
100

how many packing beds in C-6221 refining column?

what type are they? 

3

2 structured, 1 random

100

%EO in suction of G-6772/73 reactor feed pumps

~7.7%

100

How do you reduce O2 concentrations to <1%

Pressure purge with Nitrogen 4 times. 

100

Which one of our tanks only has one pump instead of two?

D-6240

100

what can be used to find chlorine leaks?

ammonia

200

Where are the PSV’s on top of C-6211 routed to and why? 


V-7201 flare, could possibly contain E.O.

200

why does the Pipe reactor get larger throughout the system?

to increase residence time

200

What kind of glycol are we going to use to start up 6811 & 6821

MEG most likely, DEG if available for 6821 bottoms

200

smallest tank in tank farm

What are the DEG day tanks

200

Where do we get water for the safety shower system

City of Freeport

300

The make stream from C-6221 refining column can be routed where? which one will be in use normally.

F.C.     C-6811 ( normal operation)

D-6870 Crude

D-6240 Purge Glycol


300

where does the condensate for evaporator reflux #456 come from?

E-6321

E-6307

E-6495 or C-6496 

(low pressure reflux hdr)

300

Why do we leave part of the over head vapors in the refining columns uncondensed

To remove low boiling impurities

300

What is the equipment number of the Poly glycol cooler?

E-6919

300

Methane supplier

Fuel gas from Kinder-Morgan

We then clean it to our standards so it will not poison catalyst

400

Explain how the 3 psv's on the PGU pipe reactor work

The 2 that relieve to 6211 are set at lower pressure than the one that goes to 6705. Its expected you will relieve all EO to 6211 before going to atmosphere or 6705

400

Why is there a hand valve on G-6702/03 recycle? 

Only want to recirculate pumps when you have to. apparently they can eat up alot of energy

400

pressure of vapor going from all vacuum packages to Lo-cal waste header. 

What is 5-9 PSIG

400

Which tanks do not have liners?

Poly tanks 6917/20

500

On C-6221 refining column re-circulation loop, there is a flow orifice on the outlet of the re-boiler (E-6223 going back to tower. 

Where is it at on the line and why?

its on the nozzle of the tower

provides back pressure on reboiler and flashes liquid when it enters column

500

Where does feed stream to reactors pick up heat along the way

6774 ABCD

E-6780 AVS OH condenser

E-6710 primary vent condenser

E-6731 pre heater

500

what are the streams that can go to bottom section of final concentrator (C-6811) just above the bottom section of packing.

Mono column heads cut

DEG column Heads cut

E-6824

C-6221 make product.

500

If the Marine Dept. calls and states that they are ready to start receiving product for "first foot samples" what do we need to do on our end?

nothing LBC will manage flow to Marine dept.

M