100

There is some win/lose as both sides need to compromise to solve a conflict.

Compromise/Reconcile

100

Defines the work required to complete the deliverables.

Project Scope

100

What phase is quality apart of?

Monitoring and Controlling Phase

100

What does a predictive approach utilize?

A predictive approach utilizes a completely defined scope before the project starts, with any change needing to be requested and approved by a change control board.

100

The securing of goods or services from an external source that is needed to complete a project    

Procurement
100

What is scope creep?

Unauthorized addition to scope, causing a project to possibly take longer and cost more.

200

One side wins and one loses

Force/Direct

200

Defines the work to be done.

Statement of Work (SOW)

200

What adjustment to the project plan will have the best chance of putting the schedule back on track?

Removing a task from the project plan
200

What is a hybrid approach?

Combines predictive and adaptive approaches.

200

What are the phases of the project life cycle? (5 phases)

Initiating, Planning, Executing, Monitoring and Controlling, Closing

200

What is the act of delivering more than what was promised on a project?

Gold Plating

300

Conflict management strategy is also known as a win/win strategy in that both sides of a conflict are looking for a positive outcome.

Collaborate/ Problem-solve

300

Organizes tasks and subtasks from a resource and cost standpoint.

Work Breakdown Structure (WBS)

300

Identifying a change request is the first step in the...

Change Management Process

300

Which type of project authority is based on comprehensive respect for a manager's knowledge and leadership abilities, even if the manager is not a subject matter expert on the actual work to be done?

Reverent

300

What is a hybrid project approach?

Contains elements of both predictive and adaptive project approaches

300

What is the falling behind of schedule of tasks but not necessarily due to additional scope

Slipping (lag)

400

One side wins more than the other

Smooth/Accommodate

400

Which parts of a project plan are interdependent during the planning phase?

Schedule, Scope, and Budget

400

When does a scope change occur?

After the change has been approved.

400

What does credibility authority come from?

Comes from experience, knowledge, and technical qualifications

400

What is a predictive approach?

Involves a well-defined scope, defined deliverables, and well-defined risk.

400

What is a group of tasks to work on in an adaptive project?

A product backlog

500

Which document serves as the official authorization for a project?

Project charter    

500

    What phase is acceptance part of?

Closing Phase

500

What is the overall purpose of closing contracts?

To ensure work has been completing accurately and satifactorily.

500

______-________ is when one task must be complete before the other task is complete

Finish-Finish

500

What is an adaptive approach?

Can have a lot of change, groups of tasks done in sprints, and can have a lot of inherent risk.

500

What should you do with the project documents and processes during the closing phase?

You should archived them so that future projects have a reference point for how to run similar processes