What does QPR and QNR stand for and who is responsible for their submission?
Quarterly Performance Report, Quarterly Narrative Report, Grantee Administrators.
What do the following stand for? DL, ED, IDL, OJE, TEGL.
Durational Limit, Equitable Distribution, Individual Durational Limit, On the Job Experience, Training and Employment Guidance Letter.
Reassessments are completed _____ in a __ month period. This is considered one of four ___________ ________ _______.
Twice, 12-month, Participant Required Actions.
What is a frozen QPR? Once frozen, can a QPR still be accessed?
A QPR that has officially been finalized by DOL. The frozen QPR still be accessed but not altered.
This must be approved by a supervisor and above, before the participant can move forward in their application.
Eligibility
This Participant Required Action or PRA is only required once, at the beginning of an enrollment and after the assignment date.
The Orientation.
Name the Waiver Factor that is automatically calculated in the system.
75 or older.
A termination letter date must be entered __ days before a participant leaves for an ______________ exit.
30, involuntary.
The participant status must be ______ to add an assignment.
Active.
A case is ______ when it has not been exited for __________ _____ within days of the __ ____.
Locked, durational limit, DL date.
True or false. A Sub-grantee Administrator can view authorized positions, allocate authorized positions and download allocated authorized positions.
False, a Grantee Administrator can do all three, but an SGA can only view authorized positions.
What are the three involuntary reasons where a Termination Letter date is required.
Durational Limit, For Cause and Ineligible at Recert due to income.
Can I withdraw a participant after they are Active in the program?
No. After any assignment, cases cannot be withdrawn.
_____ _____________ can Move and Transfer Cases.
Grant Administrators.
Exclusions at Exit include the following: deceased, ______________, participant’s health/medical and reserved forces called to duty.
Institutionalized.
The transition plan date is entered within __ months of their durational limit date. Where is this entered in the system?
12, Participant Required Actions > Assessment and Re-assessment/IEP > Transition Planning.
A case is ______ when it has not been exited for __________ _____, within the 7 allowed days.
Locked, Durational Limit.
Name a Priority of Service that is also a Most In Need Waiver Factor.
Low Literacy or Limited English, Formerly Incarcerated.