Dee May... Something...
Lean and Mean
Corporate Cartography
The Customer is Always Right
Measure Twice, Cut Once
100

This phase includes defining the problem, understanding the customer and beginning to deeply understand the process. 

What is the Define Phase?

100

This form of waste involves adding more resources to the product than is necessary to satisfy the customer.

What is Over-processing?

100

These words are what the letters of SIPOC stand for.

What are Suppliers, Inputs, Processes, Outputs, and Customers?

100

These are the two ways of collecting VOC.

What is proactively and reactively VOC?

100

A thorough assessment of a measurement process, and typically includes a specially designed experiment that seeks to identify the components of variation in that measurement process.

What is an Measurement System Analysis (MSA)?

200

The purpose of this phase is to ensure that any changes that are made are maintained for the long-term.

What is the Control phase?

200

Implementation of this Lean principal aims to prevent errors from happening during a process.

What is Mistake Proofing?

200

A process map that highlights the hand-offs between people or functions. Clarifies roles and interdependencies between process steps.

What is a Deployment or Swim Lane Map?
200

This tool organizes a large number of ideas from Voice of Customer into their natural relationships. 

What is an Affinity Diagram?

200

The 2 words that start with 'R' in the term Gauge R&R?

What is Repeatability and Reproducibility? 
300

This phase has 3 goals: determine what your output is, how well you can measure your output, and how your output is performing currently. 

What is the Measure phase?

300

This form of waste involves making more than what is demanded by the customer.

What is overproduction?

300

This type of process map follows a single product along a value stream, looks at lead-time and inventory.

What is Value Stream Map?

300

These are the 3 elements of the 'Switch' principle of Change management.

What is Direct the Rider, Motivate the Element, and Shape/Clear the Path?

300

A detailed plan that describes what to measure, what tools will be used to measure it, how often is that data collected, for how long, etc.

What is a Measurement Plan?

400

This phase looks the collected data to determine what inputs (x's) affect the process outputs (y's).

What is the Analyze phase?

400

A systematic and scientific process for effectively solving any problem that is represented on one side of a single (11”x17”) piece of paper.

What is A3?

400

A type of process map that visually represents the sequence of steps required to generate an output. 

What is a Detailed Process Map?

400

The term used to describe the process of capturing customer experiences, feedback, expectations and preferences in relation to a process or product. 

What is Voice of Customer (VOC)?

400

The two types of data collection methods.

What is Automatic and Manual Data Collection?

500

This phase involves evaluating solutions, implementing countermeasures and assessing whether solutions affect other processes or outputs.

What is Improve phase?

500

A foundation of Lean philosophy: all effort and work should add this to the final product.

Value

500

The Principle which states that in many situations ~80% of the problems are caused by ~20% of the contributors

What is Pareto?

500

This tool is used to identify individuals or groups impacted by the project, assess their level of risk, awareness and contribution to the project. 

What is a Stakeholder Analysis?

500

This is a structured method of ensuring clarity surrounding measurement characteristics of a defect.

What is an Operational Definition?

M
e
n
u