Trenches/Service Laterals
Gas
Electric
AV
Tariffs
100

True/False - Natural Gas and Electric utilities are allowed to be in the same trench

What is True?

100

Pool/Spa Heaters are typically this many BTUs of input

What is 400?

100

PG&E Standard Residential provided Voltage in most areas

What is 240 Volts?

100

This is the maximum amount of business days allowed to clear the AVCC Task Code

What is 3?

100

This is the rule for description of Service

What is Rule 2?
200

True/False - Propane Gas and Electric utilities are allowed to be in the same trench

What is False?

200

True/False - Natural Gas is heavier than air

What is False?

200

The maximum span length of PG&E’s service drop to a temporary pole must not exceed ___ feet

What is 100'

200

This is an example of

What is a Single/One Line Diagram

200

This is the Rule governing Replacement of Overhead with Underground Electric Facilities 

What is Rule 20?

300

The maximum height of a retaining wall over a gas service lateral

What is 3'?

300

The size/rating plate of this gas meter

What is a R275/275?

300

This is the minimum distance of operating room clearance in front of a pad mounted transformer door

What is 8'?

300

The amount of EV Chargers on a project that would route it to the EGI group instead of local

What is more than 4 (5 or more)?

300

This is the rule that governs for both electric and gas distribution or main extensions

What is 15?

400

The tool that's used to clear and prove conduits

What is a Mandrel?

400

.25 OR 1/4 PSI is equal to this many inches of water column measurement

What is 7"?

400

For electric distribution, low-voltage and high-voltage lines rated up to 60,000 volts, applicants must establish a 15-foot “low-growth” zone on both sides of all new lines. Applicants also must ensure that all branches with potential overhang within ________ feet of the conductors are trimmed.

What is 4?

400

The EA amount UC Berkeley would have to pay for relocating an underground electric service line to an office building

What is $2500?

400

The Rule governing Solar/Generating Facility Interconnection Projects

What is Rule 21?

500

PG&E Wire Conductor Installation

To minimize the possibility of cable damage during installation, the following design parameters must be followed:

1. The total number of factory bends installed in conduit run for primary cable must not exceed 300 degrees, including the bend at the feed-in location. Only factory bends  are allowed.

2. The total number of factory bends installed in conduit runs for secondary cable and services having a maximum length of 200 feet must not exceed ___ degrees

What is 315?

500

This is the Maximum amount of Diversified BTU load an AL800 diaphragm Gas Meter can be installed for

What is a 1,120,000 BTUs

500

SCI - This is the minimum amount of service length coming from a 50kva TX to a 100A panel with 1/0A wire

What is 38'

500

This is the Maximum amount of Diversified BTU load an AL800 Gas Meter can be installed for

What is a 1,120,000 BTUs

500

These are the two rates for new streetlights that Express Connections Fresno can process

What are LS-1A and OL-1?