SFL Build
QCing
Issues Analysis
MCAP
Your Lead
1

These are the four basic elbow orientation names.

What are Side bend right, Side bend left, Sag, and Overbend?

1

When pipe is tapped off, this feature is assumed.

What is a Mueller Valve Tee?

1

All columns in PFL Data tab have to be unhidden before this macro is executed.

What is IssuesAnalysis?

1

Under this circumstance, the Dig Request Form is not created.

What is No Digs?

1

Johanna earned these two bachelor's degrees

What are BS in Mechanical Engineering and a BA in English?

2

Placing an asterisk by the pressure test elevation value indicates this source of information.

What is Google Earth?

2

When inputting Strength Test or Strength Test Design into an SFL, this column shows the main difference between the two.

What is Test Duration?

2

Four circumstances resulting in features needing to be manually imported into the Issues Analysis Tab.

What are: Features passing with CA in scope of a dig, GIS Only Features, Assumed Features, and Overpressurized Features?

2

These features with issues are excluded from the IR/Dig Diagram.

What are GIS Only/Assumed Features?

2

Johanna attended the flagship campus of this university, located in the Town of Amherst.

What is the University of Massachusetts?

3

Elbows should be assumed as this type of radius when building.

What is Short?

3

GIS/Assumed features are required to have this install date and job number.

What are Pre-1970/Post-1970, Unknown?

3

These two feature types can be grouped together.

What are Field Bend and Pipe?

3

This color is prohibited from use on the Dig/IR Diagrams.

What is Yellow?

3

Johanna competed at US Masters' Nationals in this team sport. 

What is Synchronized Swimming (Artistic Swimming)?

4

This main grade also indicates the seam type of the pipe.

What is WPB?

4

The change log tab is used for this purpose.

What is tracking internal post production changes?

4

This feature grouping rule is used for elbows installed prior to 1960.

What is every unique angle must be grouped separately?

4

This is the description of units when one scoping Project is completely cleared by another. (Ex. adjacent pressure tests, or all feature groups of one project are present in another separate project).

What is a Data Line?

4

The number of times Johanna has driven across the US.

What is three?

5

One of the two feature types that bear no pressure in our SFLs.

What is Pipe Appurtenance or Sleeve Type A?

5

The most forgotten cell that QCers should be filling out.

What is QC Date Complete?

5

This federal code determines when something is "One Class Out"

What is CFR 192.611?

5

This is a description of "A to B" length and how it's used.

What is... There will be two separate lengths for the pressure tests in the scoping document. The "A to B" length is described as the total length of a pressure test in SFLs that includes all features needing to be tested and extends to natural stopping points. Examples, Taps, Valves, Plugs. The A to B length is inputted in the N-Q column, and the length of features impacted is inputted in column M.   ...?

5

This is the team Johanna started on at GTS.

What is the Stations Team?

M
e
n
u