What are the two new components introduced as part of NCP work?
SymV8, MTS/NCP
What is the RBV for Visual Studio Conversion epic?
1200
When is Zero bug targeted for 22.17?
28-Feb
Which Agile methodology (model) helps to visualize the workflow and supports continuous flow of work
Kanban
What is the projected improvement for NGC with respect to Threat Model?
Improve Threat Model to 80%
What are the top two features used by end users from CSP Beta testing?
VPN & Device Security
What is the number of unique users and provisioning scripts downloaded using Devstack as of now?
121 / 1203
Name 3 folks who have newly joined NGC Chennai teams in the last 2 PIs
Ernest, Divakar, Sayak
Name the technique that uses Roles and Personas for developing a product
Story Map
What is the proposed improvement in build time that NAK team is working on?
Reduce build time by 30 minutes
Out of the total 60 Epics we have for 2019.4 PI, how many are tagged to Engineering work. Name any 4 of them.
No. of Epics: 8
1. Update to Visual Studio 2017 version 15.7.6
2. Asset Compliance with Snow Agent,
3. Support for Windows 10 Build 19H1 RTM build
4. ccSettings user to Kernel mode commn
5. FY'19 Automation goals
6. Engineering Excellence & Tech debt
7. Telemetry analysis of WDAP
8. Persistence Monitoring Tool Integration
What is our average manual testing % over the last 4 releases that have gone out?
30%
What are the total number of Scrum Teams working for NGC now?
16 (includes Arrow)
Name the three elements of user voice which forms an User Story
User Role
Activity
Value
What are the current state of NGC FY'19 Automation Goals?
L1 Automation - 91.9%
FR - 4.2 (EN) / 6.2% (MUI)
Coverage - 66.69% , 44.84%
What are the major changes expected out of Win 10 19H1 release that could impact our product?
Sandbox, Tamper Protection, Protection History and Reserved Storage Space
What does PETS Stand for?
Priority, Errors, Timeout, Size
What are the 5 parameters required as part of Risk Register?
Risk description, Impacted areas, Probability of Occurrence, Risk Impact, Risk Response Strategy
What are the 5 Levels of planning as per Scrum?
Product Vision
Product Roadmap
Release Plan
Sprint Plan
Daily Commitment
What are the three improvements we made during this PI planning based on last PI's retro?
1. Criteria For Epic To be Listed for Epic Choice has to be modified
2. To Improve the team Participation during PI planning
3. Move PI event Retro to Day 2 to close the PI planning on Day 2
Name the three campaigns launched as part of ToD to find information about users systems
Display Resolution, Windows Subsystem for Linux,
Users with WiFi privacy installed
Which are the 5 components that are expected to plan capacity for NCP copy-up support activities?
OCL, CLT, NCP, Symqual and NAK
Name at least 4 epics that are going to be released with 22.16.4
1. Release CSP Retail layouts with Production SKUs
2. Umbrella Co-branding
3. Disabling reboot prompt for SEPC
4. Overinstallfix for VPN
5. Fixing a product does not start after restart issue
6. Re-Enable PIF targeting for Wi-Fi MOT
If a team's velocity was 33 going into the last sprint and they just completed 35 points, then what would be the new velocity
.7*60 + .3*70 = 44.1
What is the proposed team appreciation criteria?
Factors during PI Planning:
Factors throughout PI:
1. Adhering to Jira Hygiene
2. Adhering to DoD
3. Defect removal Efficiency
4. ABAT fix turn around time
5. Defect Grooming Turn Around time