Toxicology
ICS
Air Monitoring
Hazard/Risk Assessment
Decontamination
100
PEL
What is Permissible Exposure Limit?
100
ICS
What is Incident Command System?
100
This calibration occurs daily prior to use
What is "bump test?"
100

This diamond-shaped sign must be affixed to any vehicle that carries hazardous materials.

What is a placard?

100

This is the main purpose of decontamination at a hazardous materials emergency

What is to limit the spread of contaminants from the release area?

200
STEL
What is Short Term Exposure Limit
200
ICP
What is Integrated Contingency Plan?
200
PID
What is Photoionization Detector?
200
ERG
Emergency Response Guide
200

No liquid is used in this type of decon

What is Dry Decon?

300
Exposure limits are typically expressed as these
What are Parts per Million?
300

NIMS

What is National Incident Management Systems?

300
IDLH
Immediately Dangerous to Life and Health
300

This guide to chemical hazards is intended as a source of general industrial hygiene information on several hundred chemicals/classes for workers, employers, and occupational health professionals.

What is the NIOSH Pocket Guide?

300
These are the 3 work zones in a spill response
What are the exclusion (hot) zone, the contamination reduction (warm) zone, and the support (cold) zone?
400
A response to a toxin that is delayed or accumulative
What is chronic?
400
These are the 5 Sections of ICS
What are Command, Planning, Operations, Logistics, and Finance?
400
This common chemical causes olfactory fatigue
What is hydrogen sulfide (H2S)?
400
This is the first objective of any spill response
What is the safety of personnel?
400
The point in a spill response when decon is set up
What is before initial entry?
500
These are the four main routes of entry for chemical exposure
What are absorption, inhalation, ingestion, and injection
500
These 5 positions make up the typical Unified Command
What are FOSC, SOSC, RPIC, LOSC, TOSC?
500
This ICS form documents the results of air monitoring during a spill response
What is the Site Safety Plan?
500
The immediate response to a release of a flammable material is to eliminate these. 
What are ignition sources?
500
Decon is set up in this work zone
What is the contamination reduction zone or warm zone?
M
e
n
u