What PPE is Needed?
Glasses, Jeans, Boots, Face shield, Gloves
What must always be removed before starting drill press?
Chuck Key
How Many emergency shut offs are there?
5
What are the different processes our shear can do?
Shear, Bend, Punch
19' 7 3/16" + 12' 9 3/8" =
32' 4 9/16"
What must always stay on the grinder at all times?
Guard, Handle
What side of the drill press should we overhang excess of material?
Left side
Where is our eye wash station located?
Near Shop door leading to hall way
What is the first thing we check for before starting the shear?
Any fluid leaks
62' 4 1/4"+ 13' 6 7/16" =
75' 10 9/16"
What do we do with material being ground?
Clamp to table
What PPE should be removed before starting drill press?
Gloves
What PPE is needed to enter the shop?
Jeans, Boots, Safety Glasses
What do you press to engage the shear?
Foot peddle
What does OSHA stand for?
Occupational safety and health administration
What do we check for in our area before grinding?
For combustibles or flammable materials
What color don't we want the chips of metal to be?
Blue
Who's job is it to report unsafe behavior?
everyone's
What must you do before grabbing your material?
Turn machine off
What does SDS stand for?
Safety Data Sheet

Sanding disk/ Flap wheel
What is the part called that holds the drill bit?
Chuck
What number do you call in case of an emergency?
*5000
What must be done to material before starting shear?
Clamped down with table clamp
What is the most dangerous tool used in the field?
Grinder