Liver damage is an example this effect of overexposure to a chemical.
Chronic effect.
Any waste in Drums or Totes pending determination should be stored in this area.
HazWaste storage area in lower warehouse.
When are all employees required to keep their work area clean and orderly.
At all times
Required to present this to the Security Guard upon entry AND exiting the facility.
Badge.
The primary assembly point (or rally point) in the event of an emergency.
Along 10th Street (near the scale)
Resetting a 480v breaker or greater in the tripped position can ONLY be performed by ______________.
A Qualified Electrician.
This type of material can ignite within five minutes after contacting air.
Pyrophorics
In the Upper Warehouse, the Hazardous Waste label on a sludge drum shall be dated at this time.
As soon as the drum is full.
These types of buckets and totes are prohibited outside of the Upper Warehouse or Antifreeze unloading areas.
Plastic
Under this condition it is acceptable to allow a coworker to share your login when they have forgotten their login credentials and their training is nearing overdue.
No Condition or Never.
Hourly employees are not allowed to leave the plant when they are scheduled on shift without this.(ADMP0740)
Approval from their Supervisor.
Cell Phone Class 1, Div 2 cases are required if a phone is on your person in these areas. (Name 2 areas)
1. Process Areas
2. Tank Farms
3. Where ignitable vapors are potential
4. Inside the horseshoe ring in upper warehouse
5. On top of a tanker or railcar with the lid open.
Of the three types of hazard labels (GHS, HMIS, and NFPA), this label is required to provide information about personal protection requirements.
HMIS (Hazardous Materials Identification System)
(NFPA and GHS labels identify hazards but do not give PPE requirements)
All containers must be labeled with these two items.
1. Material name
2. Associated hazards/ waste profile label.
This is how often a department will complete a housekeeping checklist to cover SPCC/SWPPP items and general housekeeping in offices, shops, lab storage, process pads.
Weekly (NOTE: When was the last department weekly checklist used by someone in your department).
This person notifies Security of a scheduled visit prior to them arriving (usually 24hour or more) and this person is notified prior to entry by visitor or contractor.
Plant Contact
The most common pre-printed Haz-Waste(yellow) and Non-HazWaste(blue) drum labels can be found in this location (CC1020).
Upper Warehouse
In the event of a spill in the east parking lot, this most be closed immediately.
The valve at OutFall 002 sump (by pushing the t-handle down).
The GHS distinguishes between _______ and _______ exposures for target organ effects.
single and repeat
The distance of clearance needed between rows of Hazardous Material (pallets of drums or totes).
30 inches (and 18" from the wall)
The Policy identifies the departments that have responsibility of every area at the site to keep clean. The department that is responsible for the men's locker room downstairs is ____________.
Maintenance. (Although the men's locker room is not specifically identified in the policy, Maintenance is listed as responsible for "all other areas not listed").
Contractor badges are good for __________ days and orientation training regularly occurs on ____________ and ____________ at ________.
365 days (or 1 year)
Tuesday and Thursday 7:45am
The primary document required prior to startup of a Level 2 or 3 Management of Change (MOC).
PSSR (Pre-Startup Safety Review)
Name the shortcut to look up SDS's.

Hazardous liquid is leaking from a tank. An awareness level responder should do these three things. (must answer 2)
1. Notify the authorities of the spill
2. Warn personnel to stay away from the spill
3. Identify the substance from a safe distance.
If, as a result of the inspection, it is noted that a Best Management Practices (BMP) is not adequately controlling pollutants as intended, or if the facility’s potential pollutant sources change, the Storm Water Pollution Prevention Plan (SWPPP) shall be revised within how many days of the inspection.
14 days
There are five methods used to address and communicate DAILY HOUSEKEEPING issues/concerns, name at least two.
1. Plant Manager, or designee, daily site tour
2. Shift Handover
3. Safe Work Permit close-out.
4. Daily Checklist for Site Services Tasks
5. Daily Checklist for the Maintenance Shop
Plant Security measures are based on the perceived risk to the plant and ____________.
surrounding community.
All employees may participate in an auditing process. There are 4 types of audits performed each month of which salaried personnel are required to perform at least one of each per month. Name at least 2 of these types of audits.
1. Site Specific Survey (HSEF0983)
2. Safe Work Permit Audits (HSEC0134)
3. Planned General Inspection (aka Safety Walk or PGI – HSEC0684)
4. Procedure Field Audit (ADMF0234)
5. Rail Car Inspection Audit(4 required/month) (LOGF0988)
The following page in SharePoint is located on the HSSE Page. The link to learn what the physical requirements for any job would be located through which link.

Job Demands Forms (Health & Hygiene --> 3.Medical Protocol)