Trowel This
Foundations Are Beneath Me
Cure Me Now
I have Drainage Issues
I'm a Stormwater Polluter
200

What document would you use to find the frequency of testing for concrete paving?        

Guide Schedule

200

When pouring a drill shaft, can a steel casing be left in place?

No, unless plans require it

200

How many times do you have to input a concrete mix design into SiteManager?

1 per class, per source, per project minimum

200

True/False - General Notes, Summary Sheets, Plan and Profile, Culvert Layouts, Bridge Layouts, Drainage Standards, BCS and SETFW sheets contain drainage information?

True

200

Give one example of Erosion control?

Vegetation(grass), Soil Retention Blankets (SRB), Mulch/Erosion Control Compost

400

What is the standard time allowed after concrete paving is placed should you saw-cut the joints?

As soon as possible without damaging concrete

400

Do we have to contain the spoils while drilling a shaft?

Yes

400

How must curing compound be applied on fresh concrete?

Uniformly

400

What is the clear cover for rebar for a SET?

1.25” as per standard SETB-FW-S (MOD)

400

Give one example of Sediment control?

SCF, ECL, RFD, Sand Bags or Berm

600

What should you NOT see on concrete pavement after cure application?

No bare spots, concrete should be white (pink) with cure 100%

600

Can the concrete free fall while pouring the shaft?

Yes. See Article 416.3.6

600

How often do you check the temperature of loads for Mass placement and Bridge slabs?

Every truck

600

In regards to the flow of water, in what direction should Pipes/boxes be laid?

From downstream end to upstream end, Bell to Spigot connection

600

What is the purpose of SWP3?

To prevent degradation of receiving waters.

800

How many Strength & Fresh Tests are required for TXDOT to perform on concrete pavement production?

1 for every 10 that the contractor performs during production and the first few loads at the beginning of production

800

What safety precautions are required for an inspector to check steel in a cap?

Safety harness

800

What is a QM?

Quality Monitor / It applies to assure materials incorporated into a pay item have been tested and approved.

800

What is a Sofit?

A Sofit is where the water is coming into the inlet.

800

True/False - The SW3P Bulletin Board can be located off-site from a project.

False. It must be located on the project

1000

What size is a #4 rebar in inches?

½”

All bars are measured by 8ths of an inch and this would be 4/8" or 1/2"

1000

When driving piling, how much cushion block is needed for 55 foot piling?

6 inches

1000

Is there a tolerance of increasing the slump of concrete above the Tables in the Spec book?

No unless approved in advance by the Engineer.

1000

In your plans, what is the spacing for the pipe runners?

2.167’ Sheet 62 SETB-FW-S

1000

True/False - A contractor does not need approval to make a temporary crossing across a creek.

False. The contractor must provide a plan for review and approval  to install a temporary crossing for a creek.