MOC
MOC Responsibilities
Impact/Risk Assessments
Deviation Responsibilities
Deviations
100


The principle of properly assessing, addressing and controlling the impacts of any proposed changes to the workplace before the changes take place.


What is Management of Change 

100

Complete Final Approval of Global Management of Change (MOC)

Who is the VP of Quality 

100

The NRP will be responsible for leading but shall not complete without the participation of the multidiscipline group

What is the Impact Risk Assessment

100

Develops and Implement Global Deviation Procedure   

Who is Global Quality Systems Manager (GQSM)

100

When a situation occurs that requires technical or administrative departure from normal Business Management System processes and procedures

What is a deviation?

200

System used to document and track changes. 

What is Master Control

200

Complete Final Approval of Site Management of Change (MOC)


Who is Site Quality Manager?

200

Severity and Likelihood combined 

What is risk rating?

200

Initiate Deviations

Who is ILC Dover LP Employee?

200

Guidance that provides requirements for maintaining Deviation Records 

What is Control of Records MSP-G-52

300

When a change involves a safety concern, this assessment should be performed before startup. 

What is Pre-Startup Safety Review (PSSR)

300
Lead MOC process to completion for proposed change

Who is Nominated Responsible Person/  Quality Representative?

300

When does Master Control not require you to complete the risk/impact assessment, but it is a requirement of ILC Dover LP 

What is Planned Deviations?

300

Participate in Multidiscipline team to complete Investigation

Participate in Multidiscipline team Risk Assessment

Complete Deviation Approval

Who are Directors/Functional Managers?

300

Tracking, trending, and reporting of deviations at predetermine frequency

What is Management Review MSP-G-24

400

Risk/Impact meetings must have these departments present. 

What is Quality and EHS

400

Develop and Implement Global Management of Change Procedure to ensure full control of GMP changes in compliance to Global BMS.
Track Global Deviations to completion and report out during Management Review

Who is the Global Quality Systems Manager

400

Even if you have plans that will mitigate or eliminate this it must be identified. 

What is risk?

400

shall maintain ownership of planned deviation until actions item task have been received back from assignee(s)  

Who is Initiator

400

Policy deviations start with POl

Management System Process deviations start with – MSP

Procedure deviation starts with- PRO

 Validation deviations start with- VAL


What is deviation title prefix?

500

Multidiscipline group meets to discuss what could happen and rates the likelihood and severity

What is Impact/Risk Assessment

500

Adhere to this procedure for MOC of GMP related activities

Participate in Multidiscipline team Risk Assessment

Act as Nominated Responsible Person


Who is ILC Dover LP Employees

500

Completion of this including ratings and actions is mandatory in MOCs and Deviations 

What is Temp 23-17 Risk Analysis Template

500

Shall receive an email notification of assigned task from Master Control

Shall receive a task in my task inbox of Master Control

 

Who is Action Item Assignee (AIA)  

500

These users have access to their sites and global FBS Deviation vault

Who is Master Control Power users 