A roadway worker who is qualified to establish on-track safety for roadway work groups, and lone workers qualified to establish on-track safety for themselves.
Who is the RWIC?
A 50/50 duty cycle is the?
What is Optimum Condition
This weeks IMCS safety focus.
What is Working Smart- Your Personal Safety
The minimum # of days of railroad service an employee must have to be assigned the duties of a watchmen?
What is 90 days (RWP rule 349 section 8)
A specific location that an affected roadway worker must occupy upon receiving a watchman’s warning of approaching movement(s)
What is the pre-determined place of safety?
A current limiting fuse should be used where a fast response is desired and will interrupt a short circuit before?
What is can build to it full value.
BONUS QUESTION
How must we Secure the Right of Way?
By making sure to close and lock the gates when entering and exiting the access points to the right of way (tracks)
What rule states that employees must review and understand the Safety Instruction for each day, as indicated by the applicable Department Safety Calendar?
What is Amendment Safety Rule 1.4
What are the three Train Approach Warning Signals?
What is Warning, Verify, & Resume Work.
All concrete work shall comply with the requirements of the latest edition of ? building code, ? detailing manual, and the specifications for structural concrete for building.
What is ACI?
The rule # that states: While performing operations that require a face shield or welding shield, safety glasses or goggles must also be worn?
What is Rule # 5.9 (Safety Rule Book)
The safety rule states: Burning of any kind, such as trash, ties, etc., for warming is prohibited?
What is safety rule # 11.9
A segment of track with definite boundaries established in accordance with this manual upon which trains, engines and on-track equipment may move only as authorized by the roadway worker having control over that defined segment of track.
What are working limits?
Unless required to comply with recommendations by historic commissions, ? shall laid in standards running bond, unless approved otherwise by the Amtrak Project Manager.
What is All Masonry?
If a RWIC allows 3 other gang to come and work into their working limits how many Supplemental Shunting Devices (SSD) are needed?
What is 4 for each gang?