NAMP
RADIOS
LIFE RAFTS
PORTS
DRY SUITS
100
The acronym for NAMP.
What is NAVAL AVATION MAINTANCE PROGRAM.
100
The steps to turn OFF the PRQ–7 radio.
What is Pressing any three keys on the keypad and the PTT key
100
The LRU-23/P one man liferaft is constructed of.
What is Single ply polyurethane coated nylon fabric.
100
Inspection cycle of the portable oxygen regulator test set.
What is 28 day and 365 day inspection.
100
The three things that are determined when finding the size of anti-exposure suit.
What is height, weight, and chest measurements
200
The 3 different levels of maintenance in the navy.
What is organization level, Intermediate level and Depo.
200
The time PRQ–7 radio is rated to withstand salt water immersion at depths of one meter.
What is 12 hours.
200
The proper weight of the FLU-6/P for the LR-13/P liferaft.
What is .50 +- .05 lbs.
200
The Minimum nitrogen operating levels when ports in use.
What is 500 pis.
200
The point at which the CWU-62/p must be stabilized at gaged reading during the air leakage test.
What is 7.5 inches
300
NO DEFECT - removed/installed due to scheduled maintenance, modification, or high time.
What is MAL CODE 804
300
The acronym for JSETS.
What is Joint SARSAT Electronics Tracking System.
300
The test pressure when leak testing the LRU-23/P one man liferaft min and max.
What is 1.6 psig from an initial pressure of 2.0 psig but no lower.
300
The publication for the ports.
What is 17-15-535
300
The longest an anti-exposure suit can be inflated during air leakage test
What is 5 minutes.
400
This code is used when a need for maintenance is discovered during any receiving, screening, in-process or final QA inspection (scheduled or unscheduled) conducted by personnel acting in the capacity of QAR, CDQAR, or CDI.
What is when discover code R.
400
The frequency the AN/PRC-149 use for emergency messages.
What is 406.025 MHz.
400
The LRU-30/A MPLR is made to hold this many people.
What is 8 people.
400
Major components of the ports machine.
What is the test stand vacuum pump and accessories kit.
400
The service life of the OTS 600.
What is 10 years from the date of manufacture or when beyond economical repair.
500
THE SIX PROGRAMS MANAGED BY QA.
What is NAMDRP,(QA) Audit Program,Aircraft Confined Space Program,Central Technical Publications Library,SE Misuse/Abuse Program, Safety.
500
The amount of time GPS fix for the PRQ-7 radio is valid.
What is 5 days.
500
The maximum time it takes for the LRU-13/A liferaft to inflate to its designed shape during leak test.
What is 1 minute.
500
4 systems the ports machine operates on.
What is total 19 systems LFE, FLOW METER, VACUUM, SUPPLY NITROGEN, HIGH PRESSURE, STEP DOWN PRESSURE, LOW PRESSURE, PRESSURE LEAK CONTROL, RELIEF FLOW, 20 PIS, ANTI-G, ALTITUDE CONTROL/MAKE UP FLOW, AUXILIARY FLOW, OUTLET FLOW, ELECTRICAL, CONNECTING CABLES, CONTROLLERS.
500
Trimming is needed on the neck seal of the ots-600 maximum measurement it shouldn’t exceed for each trim.
What is ¼ inch at a time.
M
e
n
u