What is the minimum required PPE to enter the Plant?

1. Hard Hat

2. Safety Glasses

3. Steel toe 

4. long sleeves

100

What are the steps for adding parts to a work order?

1. Select "issue material"

2. Enter user name

3. enter M# and quantity

3 select add item

4. Select all items and press the "issue"

5. Verify green check box is present.

100

When performing a task which is more important, Quality or Quantity?

Quality

100

Periodic tank inspections fall under what category of PSM?

MI- Mechanical Integrity

200

Name 4 areas that require a hot work to use power tools.

Building 27- Phosphites

Building 44- Acid/ Hipure

Building 46- 9228

Building 35- AP

SC420- AP

Building 36- Rail loading/unloading

200

When a work order needs additional parts who do you notify?

Planner.  WO will be placed in Schedule 40 (awaiting parts)

200

Currently, what type equipment receives a failure flag?

Rotating Equipment

200

What is the name of the hardware that must be used for piping/flanges when working with acid?

Xylan or commonly known as fluoropolymer

300

Where do contaminated Haz rated rags and debris get disposed?

A separate waste stream container must be created for these items.  Safety must be notified so the proper placards can be placed on the drums and staged in the correct area.

300

Name each work order status (0, 20, 30, 40, 50, 60, 70)

0- unapproved

20-In-planning

30 waiting on Op's

40- Waiting on PArts

50- cleared for Maintenance

60- Scheduled

70- Complete

300

When performing a PM and issues are found that can not be repaired on the spot, what should you do?

Create a follow up work order so the work can be scheduled.

300

What document must be filled out when a deviation is necessary to run an operation?

PHA- Process Hazard Analysis

400

When using the scissor lift is a person required to tie off?

No

Tie off is required when utilizing a boom lift.

400

What is the minimum percentage of hours worked that must be documented each week?

80%

400

When installing a pump or motor what must be turned in?

Alignment sheet must be turned in.

400

What 2 documents be must completed when a process component is modified or is not "like in kind"?

MOC and PSSR

500

Do all anchor points need to be certified?

No

• Fall Arrest » 

Non-Certified: 5,000 pounds

Certified: 2 x maximum arresting force 

• Work Positioning &

Non-Certified: 3,000 pounds

Certified: 2 x foreseeable force 

• Travel Restraint

 Non-Certified: 1,000 pounds 

Certified: 2 x foreseeable force 

• Horizontal Lifeline 

Certified ONLY: 2 x maximum tension

500

What does CMMS stand for?

Computerized Maintenance Management System

500

What percentage of failure is due to improper installation of Industrial Equipment?

65%

500

What does PSSR stand for?

Pre-Start up Safety Review

M