Quality
HS&E
Initiative Management
Loss Elimination
IWS General
100
“QA BOS”
What is the Behavior Observation System for Quality Assurance Compliance?
100
The system to monitor and confront/profront Safety Bheaviors.
What is the BOS System?
100
Engineering Work Process (EWP), Global Start-up Management (GSUM+) and Reliability Engineering
What are the three key IM Systems?
100
The Pillar created by the combination of the Focused Improvement (FI) and the Work Process Improvement (WPI) Pillars
What is the Loss Elimination Pillar
100
Everybody has a part of the business
What is TEO?
200
A tool to prioritize any list of quality defects based on highest risk to the consumer and customer.
What is QRPN (Quality Risk Prediction Number)?
200
These are the 3 key Sub-Systems of the HS&E Pillar
What is are Industrial Health & Safety (IH&S), Environmental and Technical Safety?
200
This work team owns TT&T, Plant Systems, Material Plans, Operational Readiness, CQV Success Criteria, Pre-Production Cost Control and PQ for All Changes.
What is the GSUM+ Workteam?
200
The Primary Tool of the Loss Elimination Pillar
What is the "Loss Elimination Funnel"
200
Our planning and improvement cycle
What is PDCA?
300
“Everyone in P&G ”
“Who is responsible for Quality?”
300
The graphic that depicts the increasing severity of Safety incedents (Near Miss, First Aid, Recordable, Fatality)
What is the Safey Triangle?
300
To build the Capability to execute "All Change" Flawlessly
What is the objective of the IM Pillar?
300
What, Where, Which, When, Who, To Whom, How and How Much
What are the 6W2H questions to define a "Refocused Problem Statement" of any situation.
300
A leadership DMS process
What is DDS?
400
“Build Capability to identify/eliminate Quality Related Loss Help deliver and maintain Operational Stability Supports Productivity Improvement”
“What is the intent Quality Pillar?”
400
Technicians that own safety at the team level including: Saftey system comminicaitons & training, Safety Trigger level, and Safety Action Plans based on BOS data
What are Safety Functional Leaders?
400
These are three of the five EWP Phases.
What are Feasibility, Conceptual, Definition, Design/Construct and Start-up/Launch?
400
Material, equipMent, Method and huMan
What are the "4M's" of a "Cause & Effect - Fishbone Diagram"
400
IWS is a combination of these
What is TPM / PR / HPO?
500
“A Tool to Link Defects to Equipment”
“What is the PDM…Product Defect Matrix?”
500
This is the process you are required to follow for any non-routine task (Stop, Think and Act)
What is the Risk Prediciton process?
500
This IM Pillar group owns data analysis tools.
What is the Reliability Engineering (RE) group.
500
You have found the "True Cause" of your problem statement when you can
What is "TURN THE PROBLEM ON and OFF"
500
The process to set direction and strategies
What is SDDS?