What symbol is on the Wizard button?
Lightning bolt.
Electrical bolt.
What is the easiest way to graph a variable?
Click the Quick Trend button on the Toolbar.
Right click -> Data Summaries and Trends -> Quick trend chart
How do you add an additional axis to a Time Series graph?
Overlay (2nd Y Axis) tab.
What is the phone number to call to receive WIMS tech support?
1-800-677-0067
What button on Locate/Dashboard/Button allows you to embed a picture?
The Set Button
What is the background color of entry limit exceedances?
Yellow.
Light Yellow.
What is the total number of Variables that you can have in a Time Series Graph?
8.
6 on the primary axis, 2 on the overlay.
What LabCal color represents that a sample has been Analyzed?
Purple / Violet
I am looking to setup a trigger report; where do I specify which cell is the trigger cell?
In Spread Design, File -> Report Options -> Trigger Tab
I have an hourly Variable in a Monthly Data Entry Form; how do I enter/edit that data?
Double click on on cell.
Right click -> edit detail data.
What is the total number of Variables that can be added to a Multiple Variable Analysis Graph?
10.
How many permission levels are there in the Logbook Group Manager?
3.
Read / Add to / Edit
What is the formula to get a monthly average for variable 1 for the second month?
=GAVG(1,2,"M")
=GAVG(1,2,"R") with report dates set to month
How do you get into drag/drop mode to rearrange columns?
Double click "Select Mode" on the bottom of the screen.
Format - > Drag Drop Column Mode.
Name two types of graphs in Graph Pac that will show Correlations between two variables.
Correlation and Multiple Variable Analysis Graph.
You have a Manager level user who cannot schedule tasks, what must be checked to allow this account to schedule tasks?
User Setup -> Settings -> Allow to Schedule Tasks.
If part of profile, User profile Setup -> Settings - Allow to schedule Tasks.