Inventory Component Definitions
Goals & Targets
Tools & Dashboards
Safety Drivers
Fun Facts
100

Anticipation

Inventory for new initiatives before customer shipments begin

100

NPI % at CRN (Red + Orange)

4% (2% Red + 2% Orange)

100

System used for Finished Product Safety Target Setting

AITS

100

Supply Chain Uncertainty: The combined errors in demand forecast (SDFE), manufacturing (SDME), and transportation (SDTE).

One of the major drivers of increased safety stock recommendations.

100

At how many DFC does Excess UPI begin? 

Greater than 91

200

Red

Blocked Inventory (damaged, off quality, past SSD, etc.)

200

ALE % (Amber + Excess + Launch Excess)

6.5% (1% Amber + 5% Excess + 0.5% Launch Excess)

200

PowerBI App for calculating inventory components

ISC

200

Safety stock increases exponentially as 100% __ is approached

Fill Rate (TOF, Interplant Fill Rate)

200

Total NA Inventory $ (Within $0.2 Billion)

$2.9 Billion

300

Safety

Intended to Cover Variability (Can be Productive or Situational)

300

SAFE (MAGICs) Disposition Timing for NPI Inventory (Days)

90 Days Evaluation + 90 Days Disposal

300

Interactive website for assigning owners and actioning UPI/NPI 

UPI Portal

300

__ determines how fast a location can react to demand

Lead Time

300

Stock in Transit is always at the ______ location

Destination

400

Cycle

"Expected" Inventory driven by planning parameters

400

ALE (UPI) Action Plan %

80% of ALE$ needs documented action plan

400

Webapp developed to make overrides or changes easier in AITS

ITS Hub

400

Ratio of availability to requirements (not modelled in AITS)

C : D

400

NPI Disposal Methods (4)

Scrap, Donate, Garp, Remnant, Alt Use

500

Amber

Forecast ending in next 26 weeks (orange prevention) or Approaching SSD (red prevention) and will not be consumed

500

IWL Matlocs Above and Below (%)

<10% Above and <5% Below

500

New Webapp for Inventory Disposition Creation, Approval and Booking

ScrApp

500

I am the maximum value of the lot size key and minimum batch size. Increasing me drives safety down, but results in higher overall inventory.

Cycle Days

500

Inventory component with the most letters in its name

Parameter Driven Cycle

M
e
n
u