Inventory Component Definitions
Goals & Targets
Tools & Dashboards
Safety Drivers
Fun Facts
100

What is the frequency and time buckets?

Monthly and monthly buckets

100

AITS Touchless Adherence Target

>= 85%

100

System used for Finished Product Safety Target Setting

AITS

100

The current global standard tool for recommending Safety Stock Level for raw/pack materials to minimize the cash and providing the right service

PRIMA

100

At how many DFC does Excess UPI begin? 

Greater than 91

200

Why do we perform RCCPs?

To ensure we have enough capacity to support demand + variability

 

200

Location where OU stores UPI goals

Inventory Management (index for IM)

200

PowerBI App for calculating inventory components

ISC

200

Safety stock increases exponentially as 100% service is approached.  There are 2 service targets used to determine safety:

Customer Fill Rate (TOF) and Interplant Fill Rate (IOT)

200

Total NA Inventory $ (Within $0.2 Billion)

$3.0 Billion

300

Below the Line (BTL) requirements

Any requirements not yest flowing in our planning systems

300

SAFE (MAGICs) Disposition Timing for NPI Inventory (Days)

90 Days Evaluation + 90 Days Execution (Disposal) And 180 Days Total

300

Interactive website for assigning owners and actioning UPI/NPI 

UPI Portal

300

Ratio of availability to requirements (not modelled in AITS)

C : D

300

Stock in Transit is always at the ______ location

Destination

400

Who performs RCCPs?

Category Supply Planning (CSP) and/or Supply Chain Leader (SCL)

400

ALE (UPI) Action Plan %

80% of ALE$ needs documented action plan

400

Webapp developed to make overrides or changes easier in AITS

ITS Hub

400

3 Components of Effective Error (major drivers of safety reco)

Demand Forecast (SDFE), Manufacturing (SDME), and Transportation (SDTE).

400

NPI Disposal Methods (4)

Scrap, Donate, Secondary Sales, Remnant, Alt Use

500

What are some mitigation plans to reduce capacity risks? 

Offload to another line/site, pre-build, add overtime

500

IWL Matlocs Above and Below (%)

<10% Above and <5% Below

500

New Webapp for Inventory Disposition Creation, Approval and Booking

ScrApp

500

AITS is a ____ solver, meaning safety is calculated for the Supply Network for each location over the total ____

Multi-echelon, 

Lead Time

500

Inventory component with the most letters in its name (not Total Plant Stock)

Parameter Driven Cycle

M
e
n
u