The amount of backfeed (Amps) you have available with a 200A bus and a 175A main breaker.
What is 65 amps?
For Hip Roof Sections, Structural Blocking or Roof Sheathing Mounts are required for this type of framing.
What are box trusses?
The minimum offset of all roof obstructions and all roof edges.
What is 6"?
The number after 2
What is 3?
The bus rating of a panel with a label on the door that states that the bus bar rating is 225 but the sticker on the interior wall of the MSP states that its 200.
What is 200 amps?
This type of framing build also serves as a living space.
What is 'bonus-style framing'?
The preferred module orientation for a rail racking system.
What is portrait?
The number after 1006
What is 1007?
The interconnection method for a meter and main disconnect on an exterior wall (No extras loads on the main bus) and you are interconnecting on the interior sub panel.
The span you enter into the design tool when the home has 2x4 trusses @ 16" OC and a span of 18.5 feet.
What is 'just make it pass'? (trusses)
Under the 2018 fire code, at this percentage of roof area usage, 3' ridge pathways are required.
What is 33%?
The number after 106752
What is 106753?
This is commonly used to refer to NEC705.12(B)(2)(3)(b).
What is 120% rule?
For flat roof or vaulted framing, the survey is required to provide this diagram.
What is a load bearing wall sketch?
What a designer should request when the original proposal was modeled using drone imagery.
What is a traditional survey?
The number after 45327431
What is 45327432?
For trenching across high-traffic areas, these two types of conduit can be used to run wiring.
What is either RMC or PVC Sch. 80?
The software used by our structural engineering team to run calculations.
What is Forte?
This section of the 2018 Fire Code refers to Solar photovoltaic power systems.
What is section 1204?
(√7)4
What is 48.9999999997?