This date is auto-filled after filling out 3 other fields, including Monitoring Reporting Active
What is System Finalized?
This is the MOST IMPORTANT piece of information to give the customer during the welcome call
What is your contact information?
This is the name of the app that our customers download to show the progress of their system.
What is Ion Solar Sunrise?
This is where our panels and inverters are manufactured.
This is what PV stands for
What is Photovoltaic?
This is the folder that the Engineering Letter will be placed in
What is File Browser > 09 Permit > Engineering Letter?
This is the expected timeline from Install Completed to Inspection Confirmed by Customer
What is 24 hours?
This is the domain name we input for Talkdesk
What is ionsolar-partner?
This is the small piece of equipment that we can install for $500 so that the customer can track their energy consumption with Enphase.
What is a CT Ring?
This is the azimuth of a roof that faces perfectly Southeast
What is 135?
This active report shows accounts that have a CAD created and the customer has not yet approved the design
What is Design Validation Queue View?
This document is required whenever we roll any amount into the loan.
What is the Loan Adder Addendum Form?
This famous Utah Jazz player has peaked as the login name for our Site Capture
Who is John Stockton?
This small box goes on the roof to join the wiring into the attic.
What is a Soladeck? Or J-Box
This is an organization Ion Solar works with to provide worthwhile free solar via our Ion Earth program.
What is Habitat for Humanity?
This is the pathway/process for changing the primary contact email address
What is Accounts > Contacts > Edit
This needs to be created whenever an inspection fails.
What is an inspection fail case? (Or case)
This is the 7-digit Enphase ID required by Dividend
What is the Node ID?
Also, Site ID
This is a service needed when structural review fails for insufficient roof strength. It usually includes reinforcing the attic trusses and beams.
What is a retrofit?
Movement of these is what produces electrical current.
What are electrons?
This new dashboard that we covered last week shows the amount of time that each account has been in each phase of the process
What is Blank Times Dashboard?
This is the document from the city/county required by the utility company before they place the meter
What is the Final Inspection Card.
What is the name of the salesforce report showing vetted contractors we've used in the past?
What is 3rd Party Contractor Master?
This is the voltage of the IQ7 inverter
What is 240 V?
This is the percentage of total energy in the United States that is produced primarily using renewable energy.
What is 12.2%?
Solar Accounts for 5.8%