In making a coffee sequence what is the first step?
What is grab a cup for coffee
How many fittings and pieces of pipe are in this drawing
what is four
what is the most common compass used
northwest
Happy Thursday
its tuesday
this type of system is represented with solid lines
what is a waste system
there are how many sequence steps in drawing an ISO
what is 7 steps
fitting marks should be drawn _______ to the change of direction
what is parrallel
This compass has north and east on the top...
What is the south west compass
what is incorrect compass or drawn in wrong direction
This is not allowed on the A&J campus
what is smoking
You use this sequence to check your compass
Never Eat Soggy Wheat
Their are how many pieces of pipe and fittings in this drawing
what is 7 pieces of pipe and 6 fittings
This isometric compass has north west on the top and bottom left
What is the south west compass
today is march 4 2020
its the third
when drawing this iso one of the broken down lines must be going up and down
what is change of elevation
The first step to drawing an ISO
Draw your compass
quarter bends and santees are most commonly found on what type of system?
what is a vent system
this isometric compass has north on the top right corner
What is a south east compass
branch is going the wrong direction.
these are two famous Italian plumbers that are brothers
who are the mario bros
what are the three different type of sequences we practiced in class
making a coffee
soldering
how to draw an iso
when looking at this drawing which side is further from you the left or right
what is the right
Regardless of the direction on your isometric these two directions never change
What is up and down
draw compass
identify compass
draw a plan view
never eat soggy wheats
identify and count fittings and pipe
draw iso
verify fittings and pipe
draw plan view is fourth not third
this is the best instructor you have had
who is HECTOR
Which is the fourth step in drawing an iso
draw a plan view
Combyes and sweeps are commonly found in what systems
what is a waste system
This isometric compass has west located on the top left corner
What is south east
the compass is incorrect
Broken lines represent what kind of system on a plan?
what is a vent system
The final step of the isometric sequence...
What is count pipe and fittings
Their are how many fittings are in this drawing
What is 7
what are the four different type of compasses
north west
north east
south west
south east
first tee traveling south to north is turning the opp direction
how can you tell the difference between cold water lines and hot water lines in the plumbing plans
cold is single dash hot is two dashes
which sequence is the most important one in drawing an iso
DRAW YOUR COMPASS
how many tees are in this drawing? and how many branches face west
what is five tees and one branch
This isometric compass has south east on the bottom what is the name of this compass
What is south east
what is the wrong offset
you use this triangle to draw your isometric drawings
what is a 30/60
name the seven sequence steps to drawing an iso
draw compass
identify compass
never eat soggy wheats
draw planview
identify and count fittings and pipe
draw iso
verify fittings and pipe
How many pieces of pipe and 90s are in this drawing?
18 pipe and 7 90s
These directions are on the 30* axis
what is north south east and west
What is drawn in the wrong direction
tee looking up on a waste line is what?
what is a combye
Give the sequence in the correct order
1-7
there are this many fittings in this drawing
what is 20
The rolling offset is drawn on these two degrees
what is the 60 and 180 degree
branch is back wards
on a water system what type of system does a three broken lines represent
what is hot water return