ER Electrical
ER Roof Leak
Misc
Production Concerns
SPCR
100

This is not considered an emergency response.

What is anything that is not essential for life?

100

This is the team we transfer roof leaks to.

Who is centralized scheduling?

100

This large marine mammal has a tongue the size of a school bus.

What is a Blue Whale?

100

Per the Freedom Forever Contract, we guarantee this much of their Production Guarantee.

What is, it depends on their contract?

100

This team is responsible for most of the SPCR process

What is Asset Control?

200

If the customer has an electrical emergency 30+ days after PTO, this is who they need to contact.

What is an Electrician?

200

We need this document from SunRun to address roof leaks after Permission To Operate.

What is an FSD?

200

This Roman god shares a name with the 4th planet from the sun

Who is Mars?

200

These are the two spots you can find the customer's production guarantee.

What is the contract and SOW?

200

This is the time frame the system needs to produce for the customer to apply for an SPCR

What is 13 months?
300

This is the time frame after PTO the customer has to report an electrical emergency.

What is 30 days?

300

If I have a question on a procedure, I should do this/

What is reference the SOP?

300

This happens before you get struck by lightning.

What is your hair stands up?

300

You should ask this if the customer states they have increased energy consumption.

What is have there been any changes in your house?

300

This is the request to change faulty equipment.

What is Replacement of Material Authorization (RMA)?

400

This action is needed to start an electrical emergency response.

What is open a ticket?

400

This procedure is needed to perform a Roof Leak Investigation.

What is open a RLI task?

400

This is the closest galaxy to the milky way.

What is the Andromeda Galaxy?

400

Freedom Forever guarantees this.

What is production?

400

These contracts are eligible for SPCR.

What are Freedom Forever contracts?

500

These are considered Emergency Responses.

What is anything that is needed for Survival?

500

This is the timeframe in which the Branch aims to schedule the Roof Leak Investigation.

What is 24-48 hours?

500

This species of Bioluminescent fish's females are 60x larger than the males.

What are Angler Fish

500

You should ask the customer this if they call in about their production.

What is:

Can you see your current and past production?

Did you see a drop in production?

What prompted your concern?

500

This action allows us to start the SPCR.

What is an SPCR task?

M
e
n
u