Diego Torillo
Mayor Arnaldo Ardiente
Governor Emilia Ardiente-Torillo
Julio Ardiente
Lily Cruz
100

TRUE or FALSE. Regulatory Inspections should not be cancelled in EDA if the inspection was not performed.

False

100

TRUE or FALSE. XEVMPD dictionary check is required prior submission of PBRERs.

True

100

TRUE or FALSE. CAPA development and/or implementation may need to be expedited to mitigate potential impact depending on the nature and severity of the issue.

True

100

TRUE or FALSE. The PL creates an inspection notification document using CS_TP_QA02024 Notification of a Regulatory Inspection, and provides it to the QAL

False

100

Who played the role of Camia Delos Santos-Cruz / Jasmine in Wildflower?

Sunshine Cruz

200

At what calendar day does the final response document needs to be sent to customer

a. 70 days

b. 75 days

c. 80 days

d. 85 days

D. 85 days

200

Who played the role of Red Dragon?

Zsa Zsa Padilla

200

How many days must the customer return all the Call for information data?

a. 1 week

b. 3 weeks

c. 2 weeks

d. 4 weeks

C. 2 weeks

200

Which character from Wildflower said the following line: "Just like Gold, I am indestructible!"

Lily Cruz / Ivy Aguas

200

It is as QA tracking database

a. Apex Tracker

b. Event Driven Analysis

c. eTMF

B. Event Driven Analysis

300

It is the one consulted by the LS RR team for further details of the distribution?

a. AR Specialist

b. AR Coordinator

c. AR QC Reviewer

d. SMP

D. SMP

300

Defined as the Global Quality Assurance database used to document and manage quality events such as audits, regulatory inspections, findings, quality issues, investigations, corrective/preventive actions and effectiveness checks.

Electronic Quality Management System (eQMS)

300

Wildflower was aired on ABS-CBN's Primetime Bida evening block at what time?

5:45 PM PST, before TV Patrol

300

Type of delivery file that is prepared by the GRA publishing team?

XML

300

Arrange the following step for the submission of HA/PRAC Response (>12 Month Interval PBRER)

I. Add note to SARA APEX Tracker to review responses at next PBRER draft

II. Inform parties regarding delivery of file

III. File all documents with final PBRER in ELVIS

IV. Receive confirmation of delivery

II, IV, III, I

400

Who legally adopts Lily and raises her?

Priscilla Meirelles / Prianka Patil-Aguas

400

PSUR line listings include the following, EXCEPT?

a. Medically confirmed serious unlisted, serious listed cases and non-serious unlisted ADRs

b. Medically confirmed non-serious listed cases, if requested by RA’s

c. Medically unconfirmed reactions, if requested by RA

d. None of the above

C. Medically unconfirmed reactions, if requested by RA

400

Which character said "Na-stress ka ba, Emilia?"

Camia Cruz / Sunshine Cruz

400

During Issue Assessment and Triage, Lead Quality Assurance Representative is responsible for:

I. Reviews the information submitted and determines the severity.

II. Notifies the QA Vendor Qualification Team if the issue involves a vendor relationship.

III. Updates any remaining required fields in the eQMS prior to final QA approval of the investigation.

IV. Determines if the issue should be reported to Quality Assurance Review of Investigators (QA-RI) in accordance with CS_OP_QA0232 Investigator Compliance Status and Management of Investigators with Non-Compliance Issues

II and IV

400

It contains Inspection Management Checklists, training slide decks, system navigation guides for Inspectors, example documents, non-eSOP forms/templates

Inspection Management toolbox

500

Which of the following statements is/are correct about Quality Issue?

a. Represents a repeated or resolvable site non-compliance where previous mitigation plans could not bring the site back into compliance and/or where the monitor did not proactively identify and formally record the deficiencies.

b. May result in or has resulted in other regulatory authority or governmental agency enforcement action

c. Does not have the potential to significantly affect subject rights, subject safety, data integrity and/or the scientific validity of the studies

d. B & C

e. A & B

B. May result in or has resulted in other regulatory authority or governmental agency enforcement action

500

Which statement is true:

A. Never lie, give false information, or guess the answer to a specific question.

B. It is better to admit not knowing or forgetting than to give an answers that is later determined to be correct.

A. Never lie, give false information, or guess the answer to a specific question. 

500

Which character delivered the line: "I don't have time for this, I have a bride to kill. So if you'll excuse me"

Emilia Ardiente-Torillo

500

Which statement is not true:

A. For Inspections that include a project electronic TMF (eTMF) in the scope, arrange to “lock/ freeze” the eTMF or take steps to halt project team / Records & Information Management action in the eTMF to prevent changes to the eTMF from taking place during the Inspection Time.

B. For Inspections that include a paper TMF, arrangements should be made to prevent changes from taking place during the Inspection period.

A. For Inspections that include a project electronic TMF (eTMF) in the scope, arrange to “lock/ freeze” the eTMF or take steps to halt project team / Records & Information Management action in the eTMF to prevent changes to the eTMF from taking place during the Inspection Time.

500

What does PRAC mean?

Pharmacovigilance risk assessment committee

M
e
n
u