500
Name 6 of the 9 Critical Risks identified by Jacobs.
What are: (1) Work at Elevation, (2) Lifting Operations, (3) Mobile Equipment, (4) Energy Isolation, (5) Confined Spaces, (6) Electrical Work, (7) Excavations, (8) Hazardous Materials, and (9) Driving?