What are the five Safety Imperatives
What is Grounding, DO, PPE, Switching and Tagging, Pole Inspections.
How deep should a temp pole be buried in the ground?
What is 4'?
Is the De energized vs energized matrix just for cars hitting poles, True or False?
What is False.
How many employees have to be on site working together for you to have a documented prejob brief?
What is 2
What is 360
How many tags should be placed on a set of pole top reclosers if they are on HLT?
What is 2.
What size fuse goes in a fault tamer barrel on an arrester station?
What is 20?
Can you work a pole energized if it has been hit by a car and you cannot secure it with an approved means of support?
What is No?
What is the MAD of 480 volts
What is 1'1" or 13"
What is the MPH of sustained winds should you stop traveling, work and climbing?
What is 39
How many times should probe a pole while testing?
What is 16?
What is the spacing from the top of pole to the neutral spool on a single phase straight line pole?
What is 96"
Who must you contact if a pole has been damaged, and you are deciding if you work the pole energized?
What is your supervisor?
How long does it take for oxidation to build up on a set of grounds after brushing?
What is 20 mins?
What is the minimum class of traffic vest that should be worn while on jobsite if you are not directing traffic?
what is Class 2
What six items of PPE is required for you to wear while working on a parallel service?
What is hard hat, rubber gloves, FR clothing, Face shield, boots that meet all requirements and safety glasses under your face shield.
What is the maximum distance a temp pole can be from the company attachment point?
What is a 100'
Should we be using the de energized vs energized matrix on normal day to day pole change outs?
What is Yes
After establishing three-way communication with the Designated Observer, you may remove your rubber gloves if you are working from a pole or bucket and remain how many feet outside of the reach or extended reach of energized primary and conductors? Hint: Once this footage is met you have to follow five other conditions as well.
What is five'
Traffic vest/rain gear apparel shall be visible at a minimum distance of how many feet?
What is the minimum weight hammer that you can use to hammer test a pole with?
What is 3 pounds?
What is 4.
What are the four approved means of securement?
1. Boom and winch line attached to pole.
2. Quick splint, verta pole
3. Guys
4. Setting new pole beside and securing
If the pole ground is run to the top of the pole, leave how many feet of the pole ground unstapled or unconnected at the bottom of the pole so there is no direct path from the top of the pole to the work handling the bottom of the pole.
what is 15'
What does CESR stand for?
What is Cardinal Electrical Safety Rules?