Rando
Permit to Work
Working at Height
Advanced Permitting
Hot Work
Isolation
PRCS
100

A cowboy rode into town on Friday.  He stayed in town for three days and rode out on Friday. This is possible because

What is 

His horse is named Friday.

100

_________ can cancel and withdraw a permit whenever a hazardous condition develops that may compromise the safety of the job.  

Who is anyone?

100

This color scaffold tag requires 100% tie off.

What is an Orange tag?

100

A permit is considered void if the work has not started within this length of time.

What is 

4 Hours?

100

The entry attendant for PRCS can also function as the Fire Watch.

What is 

True?

100

The Red Lock is always found here.

What is…

the Lock box?



100

When any part of the body breaks the plane, it is called this

What is a 

Confined Space Entry

200

In 1997, Mike Tyson bit the ear of this opponent.

Who is

Evander Holyfield?

200

Walking out a job during the permitting process, is known by this 3 word phrase, and is required for all permitted work.

What is a Joint Jobsite Visit?

200

Fall protection is required any time we are working at this distance above grade or a lower level.

What is 

6 feet?

200

This should be included in the job description section of the permit that requires vehicle entry.

What is

Entry/Exit point

200

Process drains must be sealed within this distance of all hot work activities.

What is 

35 feet?

200

The key(s) for the Orange Lock(s) goes inside the Lock Box.

What is True?

200

This is the minimum isolation method to make entry into a confined space.

What is 

Physically disconnected and misaligned (effectively air gapped), or blinded?

300

This is always in front of you but cannot be seen

What is

The future?

300

A permit cannot be edited while in this workflow state, which is marked with a square-shaped icon.

What is…

Live?

300

Breaks and rest decks are required at or before every _____ foot section of a scaffold.

What is

10?

300

This level risk tasks will be permitted via permit template.

What are 

Low-low tasks?


300

For Low Risk Hot Work, LEL reading on the multi-gas detector should be

What is...

0%

 

300

This is the isolation method shown here

What is 

Double Block and Bleed?

300

The entry attendant must be in radio contact with the __________ at all times.


Who is 

Entry Supervisor?

400

You have two coins that equal 30 cents, and one of them is not a quarter. The coins you have are

What are 

A quarter and a nickel. (The nickel is the one that isn’t a quarter.)?

400

A Permit shall be issued for a period of no longer than

What is 

16 Hours?

400

This is the best way to shorten my free fall distance when using Personal Fall Protection (harness).

What is

Raise anchor point to at least shoulder level?

400

Abrasive Blasting requires this type of respiratory protection.

What is 

Air supplied blasting hood?

400

All initial hot work associated with a Permit Required Confined Space Entry shall be this risk level

What is...

High?

400

From the options “None”, “Personal” and “Full,” this isolation type requires zero Lock Out; Tag Out.

What is…

“None?”

400

These are the Oxygen Limits required for entry into a Confined Space.

What are

20.0% and 21.5%

500

This NBA team plays its home games at Madison Square Garden.

Who are 

The New York Knicks?

500

An LDAR technician shows up in your unit and informs you (operator) that they intend on conducting fugitive emission monitoring for VOC leaks.  This will require them to climb on a tagged and inspected scaffold.
A permit is needed to complete this task. (TRUE/FALSE)

What is 

False?

Verbally authorized tasks do not require permits and may be completed by climbing on tagged and inspected scaffolds using the required PPE.

500

A scaffold is required to be inspected by a competent person at this frequency.

What is 

Once a shift?

500

To conduct atmospheric monitoring for INITIAL ENTRY for a confined space, the ventilation must be  ________ prior to monitoring.

What is 

Turned off a minimum of 30 minutes?

500

No Normal Hot Work is posted on this drawing/document.

What is 

Noise Map?

500

An ICC consists of three (3) items, they are

What are

1. Isolation Matrix (which calculates the minimum requirement of process isolation)

2. Isolation Log (Lists every isolation point and status, test points, switches, breakers and Lock Box) or, for a Blind ICC, list of blinds.

3. Equipment Sketch (drawing that clearly corresponds to the Isolation Log).

500

LEL readings for INITIAL entry into a confined space shall be

What is 

0%?

600

This word is spelled incorrectly in every single dictionary.

What is 

incorrectly?

600

A job is not complete until this has taken place.

What is 

Housekeeping

600

This person is required to inspect fall protection systems annually.

What is a Competent Person?

600

Vehicle Entry and Powered tools fall under this level of Risk permit controls

What is

Low Risk Hot Work Controls (Vehicle Entry and Powered Tools)?

600

Every time a Medium or High Hot Work permit is written, the following shall be required:

What is 

1.Fire Watch

2.Fire extinguisher and/or charged water hose

3.Proper access and egress from the hot work area

4.All crew members must wear 4 gas monitors.

600

There are 2 types of ICCs, they are  _____ & _____.

What are…

  • Energy Isolation ICC

  • Blind ICC

600

These are the criteria for a space to be considered a confined space.

What are

1.  Is large enough and so configured one can enter an perform assigned work.

2.  Has limited means of entry and egress.

3.  Is not designed for human occupancy.

4.  Where there is a risk of injury or health effect from hazardous substances or conditions (i.e. welding fumes, process, dye checks, motorized equipment, etc.).

700

A young boy was rushed to the hospital emergency room, but the ER doctor saw the boy and refused to operate. “This boy is my son,” the doctor said. But the doctor wasn’t the boy’s father.  The ER doctor is

Who is 

The boys Mother?

700

This is the length of permit validity for a Medium risk permit.

What is...

14 Days?

700

These are the 3 components of a Personal Fall Arrest system

What are..

1. Full Body Harness

2. Suspension Trauma Straps

3. Self Retracting Lifeline (SRL)

700

The following is always required for Permit Required Confined Space entries:

What are...

1.Rescue Plan

2.Ventilation Plan

3.Entry Attendant

4.Entry Supervisor

5.Notify Emergency Response of Entry

700

The welding machine return lead should be located here.

What is 

The electrode in the firebox and the return lead as close as possible to the work station.

700

Many valves, but not all, can be used for isolation of process energy sources. Valves that are NOT to be used as isolation valves are:

What are…

1.) Check valves

2.) Control valves

3.) Pressure relief valves

4.) Any valve not providing adequate isolation

700

This is the requirement for the number of 4-gas meters for people in a PRCS.

What is

Every person entering the confined space shall wear 4-gas meter?

800

This is the smallest country in the world.

What is 

Vatican City?

800

When a permit is drafted from a template these two workflow states are bypassed.

What are…

Verify and Authorize?

800

To ensure the proper angle, the base of the ladder should be moved outward _____ for every ____ feet that it is raised.  

What is 

1 foot for every 4 feet (4 to 1 rule)

800

Below are the tasks which can executed under Personal Isolation so long as these 4 conditions are met.  They are...

  1. HVAC Work
  2. Instrumentation/ Analyzer Work
  3. Plumbing work inside buildings
  4. Lighting (troubleshooting/repair)
  5. Disconnecting and Reconnecting electrical leads inside 480V or below breaker housing.
  6.  Troubleshooting and repairs to elevators in process units and support buildings
  7. Routine motor/analyzer work in laboratories
  8. Communication/Security/ Fire Systems
  9. Oil Mist Systems
  10. Inspecting L&H equipment
  11. Craft Shop Equipment

What are...

  1. Isolation & Work conducted by one craft during one shift
  2. An effective zero energy check is conducted.
  3. Permit Holder competent to carry out isolation and permitted work.
  4. The servicing or maintenance does not create a Hazard for other people.
800

At Norco, hot work must occasionally be done on Utility Systems such as air, condensate, boiler feed water, steam, nitrogen, cooling water, domestic water, & potable water. 

In the past, this work was required to be completed behind a blind.  There are now exceptions, name them

What are;

If design does not allow for blinding, Hot Work on utility piping and equipment 250 psi and below may be performed with a minimum of a single block and bleed. 

Above 250 psi shall require a minimum of a double block and bleed.

If this cannot be achieved an Isolation Deviation Form must be used.

800

This function in PV is used to signal an isolation point that will need to be exercised AFTER the permit has been issued.


What is…

DFT or Deisolate For Test?

800

This is the minimum number of permits that must be obtained before entering and performing work inside of a confined space.

What is…

2?

Entry Permit & Permit to Work

M
e
n
u