HS-C13-5.1.2 ____ ___ ___ ___ ___ ___ shall be applied whenever any work is performed on machinery, process lines, tanks, electrical equipment, conveyor belts, mobile equipment, etc.
What is "Lock Out Tag Out Try Out."
Guiding Principle #1
What is, "People are the Solution."
Get help when handling objects weighing __ lbs or more?
What is "50"
As per HS-C5-5.4.1, Excavations, trenches or ground penetrations of ___ ____ or deeper shall require completion and approval of an Excavation/Trenching/Ground Penetration Permit prior to commencing work except for exempt areas.
What is "one foot."
Guiding Principle #6?
What is "Context Drives Behavior."
Miners employed at RMGC with the potential for exposure to the Action Level of a Time Weighted Average (TWA) of __dB or greater will be enrolled in the RMGC Hearing Conservation Program (HCP).?
What are "85"
In case of a power outage, and only one fan is running name one of the three actions to take?
What is "
- Stop mucking and trucking immediately.
- Have the Ventilation Technician do a ventilation survey of the main areas of activity, that is, the ramp and stopes with flow through ventilation.
- Determine what areas have sufficient ventilation to satisfy the ventilation standards.
Guiding Principle #2
What is, "Humility is a superpower."
The evacuation muster point for the BACK of admin?
What is "the survey yard"
RED delineators are markers for?
What is "electrical cables"
Guiding Principle #3.
What is "Errors are normal."
Guidelines HS-C1.5.1 Employees shall keep their ____________ clean at all times?
What is "Workplace"
As per HS-C12-5.1, Do not operate equipment with in __ feet of energized power lines.
What is "15"
During a level 2 TARP for Sector 4, operations my continue for up to ___ hours with out active radar monitoring?
What is "12"