RFIs
Daily Log
Quality Control
Drawings
100

This must be created if an RFI response may cause a change in the cost, time, or execution of the work.

What is a Change Event?

100

This is the last step in Procore to confirm that Daily Log information has been verified as accurate and true, which locks out further edits by others.

What is Complete The Day?

100

This Procore feature facilitates creating and implementing checklists used in regular audits of safety and Quality Control.

What is the Inspections Tool?

100

When a plan is marked with this, it means that the drawing gives approximate positions and sizes, and should not be scaled.

What is Not To Scale (NTS)?

200

This is where RFIs should be tagged using a markup tool and creating a link in Procore.

What is the Drawing tool or the drawings?

200

This should be done in the Daily Log if inclement weather stops work in accordance with weather delay time-frame from the contract.

What is check the box marked "Weather Delay"?

200

This is the plan that requires weekly audit to comply with requirements in provisions of The Clean Water Act, EPA regulations and General Use Permits.

What is the Storm water Pollution Prevention Plan?

200

This feature of the Procore Drawing tool allows you to compare the current version of the drawings to a previous version, from the internet or from your iPad.

What is the Overlay feature?

300

This should be sent to formalize a design clarification already discussed  via e-mail, phone, or in person.


What is a confirming RFI?

300

This is the section to note all materials that are being furnished by Owner or other, but installed by Stiles.

What is the Deliveries section?

300

This checklist looks for riser pipes centered in walls and that walls are of adequate size.

What is Pre-Drywall Inspection?

300

These drawing annotations can only be seen by the creator and require an extra step to be shared with the team.

What are mark-ups?

400

This is a filterable summary of all RFIs on the project with pertinent information found on Procore.

What is a "Questions and Answers" Report?

400

This is the component of the schedule that Daily Log reports can be used to substantiate a claim for time or delay due to adverse weather.

What is the critical path?

400

This document, submitted by subcontractors, spells out their plan to ensure best practices, standard of care and competent persons on the job.

What is Subcontractor Quality Control Plan?

400

You can use this feature to receive emails to be notified when revisions are added to the Drawing Tool in Procore.

What is the "Subscribe" feature?