PPE
Concrete
Ladders
Safety Hazards
100

The word that is identified by the second "P" in PPE.

Protective

100

This is needed before drilling into a slab for dowels 

Concrete penetration permit

100

How many limbs must be in contact with the ladder at any given time

3 points of contact

100

This should be filled out whenever there is a change in your task

Start card

200

Types of this PPE can be made of materials like leather, nitrile, latex, Kevlar and vinyl.

Safety gloves

200

The tool used to avoid obstructions in concrete

Concrete scanner

200

When setting up an A frame ladder it must be

Fully extended

200

An extension cord running across a walkway 

A trip hazard

300

Hearing protection should be used when noise exceeds this many decibels

85

300

The type of vacuum needed for dustless concrete drilling

HEPA vacuum

300

What three things must be in place when setting up an extension ladder

Answer: It must extend 3 feet beyond the platform, have a 4:1 ratio and be tied off top and bottom.

300

Inside a manhole, scum pit, or electrical vault

Confined space

M
e
n
u